Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

All ideas

Showing 2831

Non-responsive custom mappings

The implementation of the custom mapping page is not following adaptive (AWD) and responsive web design (RWD), which is a usability issue.The problem is shown in the attachment #1496.If the screen width is reduced, this is only possible to a fixed...
over 3 years ago in IBM Engineering - Workflow Management / Work Items 2 Future consideration

Graphical Work Week and Graphical Assignment applications not respecting Include in Schedule? (WORKORDER.INCTASKSINSCHED)

We would like Graphical Work Week (GWW) and Graphical Assignment (GA) applications to optionally respect the "Include in Schedule?" (WORKORDER.INCTASKSINSCHED) flag as it does in Graphical Scheduling (GS) and Graphical Scheduling-Large Project (GS...
over 3 years ago in IBM MAS - Scheduler 2 Future consideration

Write and associate a comment to an imported model release

It should be possible to do write text associated to a release of a model imported in DM. For example, it should be possible to do it with "File -> import" or with "File -> Definitions".
almost 7 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Web Client 0 Future consideration

Ability to preconfigure the Columns appearing by default in Query creation editor

Steps:1. Navigate to any Project area in CCM (EWM/RTC)2. Click on Work Items Menu --> Create Query3. Click on the Column DisplayPlease Observe the Columns appearing by default. Expected: I shall be able to remove the unwanted default columns (A...
about 1 year ago in IBM Engineering - Workflow Management / Reporting 1 Future consideration

provide in DNG a true CSV export option (not adding any special characters during the export)

Since you added a =" to all CSV Exports where numbers with delimiter are uses, e.g. for the "link by attribute" attribute 12345.12345 is output as ="12345.12345". You added this in "CSV Module Roundtrip with Excel can potentially corrupt textual d...
about 1 year ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Enhancement request to support hidenui ARXML export

We want to implement a automation on a Jenkins server that includes the arxml export from a rhapsody model. But with command line switch -hiddenui it is not possible to perform the export. The tool always wants to show some dialogues. Steps to rep...
over 2 years ago in IBM Engineering - Systems Design Rhapsody/RMM / AUTOSAR 1 Future consideration

Add V1 interface capabilities to V2

The V1 (IOT) interface in monitor offers enhanced capabilities to process messages. They are not all available in the V2 version in Monitor. But the V1 interface is to be abandonned.
about 1 year ago in IBM MAS - APM 0 Future consideration

Make event arguments visible in the project browser

We cannot find the arguments of an event in the project browser, so that it is pretty hard to add allocation kind of dependency between such arguments and other elements. It would be great help for engineers if such event arguments are visible in ...
over 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 1 Future consideration

PMs should have full ROUTE support implemented

PROBLEM:Certain Route based PMs have no History data even though the Work Orders are being generated. This is possibly happening from the Route not passing on any asset or location values to the history table per this IBM KB DOC: https://www.ibm.c...
over 1 year ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Future consideration

DNG Link constrains should include external links

If you have a constrain other then ANY , you cannot use the "The Web" to create a link, You cannot correctly constrain linking if you require to link to The Web. In other word, to allow to The Web, means you allow to link to everything in the proj...
over 2 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration