Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

All ideas

Showing 2831

Flir Thermal Attached camera for iOS devices for thermal inspections

Many users already have iOS devices. If we can attach a Flir Thermal camera to that same iOS device, we can enable many others to perform thermal checks/inspections with easy. Eliminating the need for another device.
6 months ago in IBM MAS - Visual Inspection / MVI Mobile 0 Future consideration

Ensure multiple ways must be given to find the information of pages.

No "search" region is given to find options of menu.Menu options should have been reached in more than one way which is not present on the page.
6 months ago in IBM TRIRIGA Application Platform 3 Future consideration

Better, more consistent, understandable name for filter "Limit by lifecycle status"

The filter name "Limit by lifecycle status" is very unfortunate. The naming style is totally inconsistent with all the other filter names such as "Artifact type", "Modified by" or "<some_attribute_name>". All these other filter names describ...
9 months ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

produce a simple data collection list for each reporting framework

Linking data collection to reporting related questions is a major task and a tough element to explain to customers, having a complete data requirements list (linked to the data model inside Envizi) for each reporting framework and individual quest...
over 1 year ago in IBM Envizi - ESG Suite / ESG Reporting Frameworks 1 Future consideration

Ability to remove the maximum characters reach pop up

We have a lot of custom fields that have maximum character set. For example account number which is 25 characters long on our case. Right now at 4.5 there a pop up warning saying that we have maximum characters reached. Where user have to click th...
9 months ago in IBM TRIRIGA Application Platform 1 Future consideration

links are not following the data model after change of artifact type

Observed behavior: I figured out that there is a link “Derived from” from a Requirement in one PA to an Information in another PA, which is not supported by the data model. (limited by a defined Linked Constraint) Steps to reproduce: Initially, th...
9 months ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Doors Next Needs Server Side Operational Behaviors

In order to add automation to Requirements Management we need to be able to perform actions when an artifact is saved. This would be similar to the use of preconditions and follow-up actions provided in EWM. Examples of things we would like to do:...
about 1 year ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

TRIRIGA Reporting - Branding

Bottom left of charts and in the TRIRIGA Reporting app - it says TRIRIGA REPORTING. We have worked really hard to rebrand TRIRIGA at our company to LMBuildings. I'm sure other companies have done something similar. It is very confusing to our end ...
about 2 years ago in IBM TRIRIGA Reporting 0 Future consideration

Allow to generate only specific topics in the compare configuration report

The compare configuration report quickly becomes a very large report which can easily crash the DOORS Next server if sufficient heap is not allocated. But even if enough heap is allocated, the EDG component only has 8GB fixed heap and many reports...
about 2 years ago in IBM Engineering - Requirements Management DOORS Next / Performance 0 Future consideration

Provide option to split configuration comparison report output into multiple files with different section headings

This would be useful because the output of the report can be very large. For us, even a small report is unwieldy at more than 500MB. Having multiple files means that the report is much easier to open and share, rather than being one monolithic fil...
about 2 years ago in IBM Engineering - Requirements Management DOORS Next / Integrations 0 Future consideration