Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

My votes

Showing 3019

Provide basic version control of template/reports assets

It is important that we know which template generated a report. It would be ideal if each version of the template that is uploaded to document builder maintained a version number. Added to this there should be an ability to switch to a version of ...
about 2 years ago in IBM Engineering - Lifecycle Optimization Publishing / Documentation Builder 2 Future consideration

Bulk-copy/move of Work Items

In the same way that it is possible to copy/move a work item, it would be very useful to be able to do it for several. In fact, exporting/importing via Excel does not allow to keep the formatting of texts. It is very tedious to copy the work items...
3 months ago in IBM Engineering - Workflow Management / Work Items 1 Future consideration

Update attachments DocLinks on the Manage database.

As part of the database update when migrating data from Maximo 7.6 to Mas 8,Update the doclinks table/urls column to match the new MAS 8 architecture.
9 months ago in IBM MAS - Manage (Base) 0 Future consideration

Present Emission Intensity figures in Emission performance dashboard - Emission Inventory table

Emission intensity is common reported figures and widely utilized to communicate the product carbon footprint
9 months ago in IBM Envizi - ESG Suite / Scope 1&2 GHG Accounting & Reporting 1 Future consideration

Support Delayed Validation in REST API setupdata

In the REST API, there is a way to perform lookups on temporary objects utilizing a request like: /maximo/oslc/os/mxwo/zombie/getlist~assetnum?lean=1&oslc.select=assetnum,description&setupdata={"location":"SHIPPING","siteid":"BEDFORD"} The...
almost 4 years ago in IBM MAS - Manage (Base) / Integration 0 Future consideration

Add the ability to assign an As-Designed space class via the Revit BIM Connector to new and existing space records

Please add the ability to assign an as-designed space class via the Revit BIM Connector to new and existing space records. This would be helpful for projects that are under construction. Currently, we assign a normal (final) space class and an as-...
over 2 years ago in IBM TRIRIGA Application Platform 1 Future consideration

Use Date/Time formats when exporting Date/Time attributes in Excel

When a user export a view containing user-defined attributes of type Date (or Time or Date-Time), these attributes are not recognized as a date format in Excel, but as plain text. If you export the Excel table from Report Builder, then the Date at...
about 1 year ago in IBM Engineering - Requirements Management DOORS Next / Feature 2 Future consideration

OCL verification support

Users can write their constraints by OCL(Object Contraint Language) on Contraint model for their model.However, they can't do verification of their models by their constraints.I want Rhapsody support to do verification of their models by constrain...
over 4 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 0 Future consideration

Enhancement request to have define formal gates on sequence diagrams

According to UML specification (2.5.1) interactions can have formal gates (Figure_17.1_UMLSpecification.png). They would allow messages from and to the diagram frame, see Figure_17.4_UmlSpecification.png and Figure_17.14_UmlSpecification.png. The ...
about 1 year ago in IBM Engineering - Systems Design Rhapsody/RMM / Rhapsody Client 3 Future consideration

Ability to add multiple inspection forms to a single work order

Inspection forms is one of the best features of Maximo Mobile and a lot of customers are adopting this product. Major draw back that we have encountered with inspection forms is that Users can associate only 1 inspection form to a work order. We a...
about 2 years ago in IBM MAS - Mobile 1 Future consideration