Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 2954

DOORS Next should give the possibility to easily switch to existing open Change Set

Hello, Use-case: the user is using GC configuration or LC configuration and wants to update a DN artifact Expectation: if there is already an open Change set (info already available as warning), there should be also the option to switch to the exi...
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Allow adding more than 10000 artifacts per module

Current situation: DNX 7.0.2 has the limitation of maximum 10000 artifacts per module. Use Case: We are receiving from our stakeholders modules containing more the 10000 artifacts and we have trouble importing them in DNX. Expected situation: remo...
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

DNG change sets shall be also available in JRS for reporting

As a user I also want to report not only in a stream or baseline, I also need to report in a change set.
almost 3 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Progress of report generation gives % indication of progress to user

This is related to defect https://jazz.net/jazz03/web/projects/Requirements%20Management#action=com.ibm.team.workitem.viewWorkItem&id=126799 When generating a report in DNG the "Percent Completion" only shows 0% complete and then it just compl...
almost 3 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

ETM: Associate this test script with a test case does not allow Select All

GE-ETM - From a Test Script On right hand panel, section titled "Parent Test Cases" click icon named "Associate this test script with a test case" Window Pops Up Select button "Associate with Existing Test Case" There is no select All button, only...
about 1 year ago in IBM Engineering - Test Management / Usability 0 Future consideration

Support Decimal Attributes in ETM

Compared with EWM, ETM has a very limited list of attribute types available for creating custom attributes. We would like these to be equivalent, but most specifically would like the ability to track decimal values in a TCER as a custom attribute.
over 2 years ago in IBM Engineering - Test Management / Usability 1 Future consideration

Prevent URI misalignment for same artifacts across different projects and components, across DNG Servers

We are in the process of migrating from v6.0.6.1 to v7.0.2. As part of the migration process, we have performed data cleanup to align the DNG Type System. However, standard usage of the system may cause us to drift overtime and issues will be intr...
about 2 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Enhance Baseline Compare to use other Attributes

We have a customised Baseline compare which allows Export of comparison to an Attribute in the Module (highlights changes from BL 1 to BL2) Allows comparison of other text Attributes (e.g. comments) which can be exported to Word or csv
over 1 year ago in IBM Engineering - Requirements Management DOORS/DOORS Web Access / Baselines 0 Future consideration

Comment for multiple artifacts in DOORS Next

Use Case Description: Select multiple artifacts and add the same comment to all artifacts, as new comment. Currently in DNX there is the possibility to perform several actions to multiple artifacts, such as: edit attributes for, add links, remove ...
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Add the ability for a supervisor to return the Inspection form to the inspector with comments upon reviewing the results and determining more information is needed

We added the ability to require a review of inspection results before they are completed. As a step 2 for this functionality, its requested to add a status indicating the form is being returned to the inspector after review for more input. We shou...
about 2 years ago in IBM MAS - Mobile 0 Future consideration