Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 2734

Moving of Requirements between Modules by maintaining the Links is not possible

The Links between Requirement (e.g. Derives To) are stored in the context of the containing Module.Unfortunately it is not possible to move a Requirement from one module to another by maintaining the links.You can only use the same Requirement (sa...
about 1 year ago in IBM Engineering - Requirements Management DOORS Next / Usability 1 Future consideration

DNG ReqIF Export shall export reused artefacts (same Base Artefact) as SPEC-OBJECTs with the same ReqIF ID

Description DOORS Next has a concept for artefact reuse. A "Base Artefact" can be reused in different contexts, meaning for example in different modules or in different places in the same module. These artefacts are still all the same artefact, me...
about 2 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Graphical Work Week and Graphical Assignment applications not respecting Include in Schedule? (WORKORDER.INCTASKSINSCHED)

We would like Graphical Work Week (GWW) and Graphical Assignment (GA) applications to optionally respect the "Include in Schedule?" (WORKORDER.INCTASKSINSCHED) flag as it does in Graphical Scheduling (GS) and Graphical Scheduling-Large Project (GS...
over 3 years ago in IBM MAS - Scheduler 2 Future consideration

Artifact-specific Permission definitions can not be shared with another Project via Process Template if Projects are Config enabled

These are the steps to reproduce the problem on a single server with default Jazz/DNG templates: • Create a new Project Area ptest1 from Template "Requirements Management application template"• Enable Configuration Management for ptest1• Initializ...
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Administration 1 Future consideration

Views on Suspect Flags not possible

In Views, we would like to be able to filter on the state of selected link types (suspect, valid, invalid). Currently it is only possible to create a view filter on the existence or non-existence of links of selected link types. Use Case (one of m...
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

DNG multiselection shall be kept after a modification

When selecting multiple artifacts and doing a bulk change the selection is unselected after the change is done. So for doing another bulk change all the requirements have to be selected again.Please change so that multiselection is kept after one ...
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Attachment between comments of a review and the review

Currently, comments and reviews are totally independent.Indeed, after a comment wrote during a review, it is possible to modify and delete the comment after the end of the review.
over 6 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Web Client 0 Future consideration

populate backlinks when creating links through a csv import

When performing csv work item imports that create links across repositories, only the link type specified in the file is created. The backlink is not created, and the only remedy is to perform a separate import specifically for those links.
over 4 years ago in IBM Engineering - Workflow Management / Work Items 1 Future consideration

Support to Add a URL Attachment from Maximo Mobile

Hi - I am using Maximo Mobile for EAM with Maximo 7.6.1.2 with Maximo Mobile 8.8 IF005. When I try to add an attachment to a Work Order, it only gives me option to add a file based attachment. I don't get option to add a URL attachment. It would b...
over 1 year ago in IBM MAS - Mobile 0 Future consideration

Add ability to export floorplans in bulk and select export size

Printing floorplans in bulk adds efficiency and functionality to space and move management because it means multiple floorplans can be printed as a packet. In the case of multi-floor moves or just for the purposes of updating maps in large campus ...
almost 3 years ago in IBM TRIRIGA Space Management 2 Future consideration