Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 2815

Tighten the linkage between work order scheduling dates and required dates for associated materials

Currently when there is a reschedule of a work order when there are materials planned on it, the materials are not rescheduled - it would be good if upon reschedule of the work orders (later than original schedule dates NOT Before ) should also ta...
over 1 year ago in IBM MAS - Manage (Base) 1 Future consideration

Provide the ability to set an execution variable value using a requirements attribute value

Many times authors and designers of requirement want the ability to define variable values as attributes on the requirements, which will later be leveraged by the test engineers testing the requirement. For example, many times the designers will d...
over 1 year ago in IBM Engineering - Test Management / Integrations 0 Future consideration

JRS ( Report Builder) does not display the full hierarchy of the category from RTC - It shall be configurable in JRS or RTC

If we have 3-4 layers of the category (filed Against) in JRS, The JRS only displays two layers. I had an exchange with Fariz and learned that its designed that way to solve some performance issue. However, Fariz also suggested to proceed with the ...
9 months ago in IBM Engineering - Reporting / JRS 1 Future consideration

SCM - Check if a Stream or Component name is unique

Current situation: If a new stream or component in SCM will be created SCM does not check if the same stream or component name already exists in the PA. This could lead to confusion for the SCM users. Required situation/Proposal: It is requested t...
10 months ago in IBM Engineering - Workflow Management / Source Control 1 Future consideration

Crosscheck/clarify how attachments are referenced in ETM artefacts

Currently the attachment referencing is done based on the naming of the attachment and not via the combination name + ID. In case an attachment is removed from the test artefact (e.g. test case) it is not possible to identify in the history of the...
10 months ago in IBM Engineering - Test Management / Usability 0 Future consideration

SCM upload status in Web View

Current behavior: When uploading a new document, there is no status regarding the upload state Requested change: When uploading a new document, to have a status regarding the upload state (E.g. in % (percentage)). It should be visible that there i...
10 months ago in IBM Engineering - Workflow Management / Source Control 1 Future consideration

Provide the capability "Duplicate and Replace" for embedded artifacts.

When requirement artifacts with embedded artifacts are duplicated (e.g. duplicate a module with option "duplicate all artifacts"), there is no way to duplicate also the embedded artifact. What we want is a functionality similar to the function "Co...
over 2 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Adjust prices in Labor Price Books with % Adjustment

Please see the attached file.
over 5 years ago in IBM MAS - Service Provider 1 Future consideration

DNG attributes to become mandatory based on the State workflow

in DNG like system, there are lot of attributes which are in place and this has to be mandatory before they can deliver. currently there is no approach possible as compared to EWM (Mandatory using Preconditions). This is big NO for us, we are miti...
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Persisting Dynamic Space Planning Application Settings

Settings in DSP are not persisted and take effect only in the current session. If the DSP form tab is reloaded applications resets to default settings. Customer does not have a way to persist their prefferred setting.
almost 4 years ago in IBM TRIRIGA Space Management 3 Future consideration