Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 2806

Picker dialog not shown in Eclipse for Git Match Query Precondition

The Require Match Query precondition is supposed to present a picker that allows you to choose a query. However, it appears that for the Git Push Operation this picker was only implemented for the web client and not the Eclipse client. Until the w...
over 3 years ago in IBM Engineering - Workflow Management / Work Items 1 Future consideration

Maximo Scheduler - Schedule Compliance Planed Hours Should Not Be Front Loaded

Currently when planned hours are calculated for the compliance period the number of hours are front loaded. This means that if a schedule is set at 7 days with an 8 hour day shift specified (total of 56 hours working time) and a WO in the schedule...
over 3 years ago in IBM MAS - Scheduler 1 Future consideration

MAXADMIN to delete schedules

MAXADMIN users should have the ability to delete schedules and work lists from Graphical Scheduling / Assignment.
almost 7 years ago in IBM MAS - Scheduler 3 Future consideration

Secondary assignments to space should not count towards the occupancy

Currently IBM TRIRIGA indicates “A person or asset might be associated to only one primary location or space, but might be associated to many secondary locations or spaces.” When IBM TRIRIGA assigns a person to a secondary location, it also adds i...
over 8 years ago in IBM TRIRIGA Space Management 4 Future consideration

Enable in EWM for a repository workspace the automatic acceptance of any incoming change

In EWM Client it is useful for some users to have the possibility to enable the feature of accepting automatically of any incoming change for a repository workspace.When starting to work on Rhapsody project, people are forgetting to accept the inc...
over 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Other 1 Future consideration

GWW and GA visibility of Log Notes raised against the work order or originating ticket

In GA and GWW there is no visibility of log notes raised against the work order only against the assignment. Log Notes raised on the Service Request or Incident are visible in Work Order Tracking, but are not displayed in the action Add/View Notes...
over 3 years ago in IBM MAS - Scheduler 0 Future consideration

OSLC links should get resolved automatically after selecting the correct GC (Global Configuration) in Rhapsody with RMM

When we open the model in Rhapsody (with RMM), after selecting a GC context, initially all the DNG/RQM links are shown as hyperlinks (unresolved). They are getting resolved upon right clicking on the link and selecting "Resolve". This is not a sho...
over 5 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Rhapsody Client 0 Future consideration

Allow Tabs to open in a new, separate Window

Currently (Rhapsody 9.0.1) only one Tab is visible at a time. But especially for animation, it's highly appreciated to locate e.g. Tabs containing panel I/O elements in a new, separate Window. Doing so you can see the effect of changes on the pane...
almost 2 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 1 Future consideration

Requested to have RMM rest API to get parent element details for model elements.

Using RMM REST API We are able to get model element details without any Issues. To get Parent element details for Child model elements we need RMM REST API.
almost 2 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Rhapsody Client 4 Future consideration

Add a "Compare snapshots" feature

With Design Manager web access 5.0.2, when you select a workspace in the Configuration Management page, DM offers features to:- compare with base snapshot- compare with flow target. The same is not possible with snapshots. Performing a compare bet...
almost 9 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Web Client 3 Future consideration