Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 2466

Initial Color of Toolbar Invoked Fill Color Dialog Box

Upon selecting the "Other" button on the "Fill Color" toolbar item, the dialog box should default to the color of the currently selected object.
almost 5 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 0 Future consideration

Rhapsody: Resolve the links to DNG/RQM automatically

When we open a model in Rhapsody, initially all the DNG/RQM links are shown as hyperlink (unresolved). They are getting resolved upon right clicking on the link and selecting "Resolve". This is not a show stopper as we can manually resolve the lin...
almost 5 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Integrations and APIs 1 Future consideration

Dependencies transparent color formatting option

We want to enhace formatting option of dependency, i.e. to hide a dependency from a diagram (such as color=transparent, no line=yes, No Fill=Yes)
almost 5 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 1 Future consideration

Make showing of tasks an option per schedule

Give a checkbox for 'Show Tasks' similar to the 'Show only top level work orders' to allow us to choose per schedule whether to show tasks or not.
almost 5 years ago in IBM MAS - Scheduler 2 Future consideration

Suppress Diagram Display of Attribute Type

Rhapsody is missing Display Option to prevent display of attribute "Type" information (for attribute objects are placed on diagrams). Similar behavior occurs if project type is not "SysML"; but rather default project type and a "Attribute" is adde...
almost 5 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 1 Future consideration

Easily invoke and cancel Pan tool while drawing

Add keyboard shortcut to invoke diagram Pan tool and "cancel" the tool by use of escape key. Note: "cancel" implies resume of whatever diagram toolbar tool was selected prior to invoking the Pan tool.
almost 5 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 1 Future consideration

Maximo O&G: Create WO/SR from Operator Log - Event Log Entry

Enhance the ability of operator log application to create sr/WO from the log entry row and pass the log entry data (e.g. event time, description) to the SR/WO . Currently, one can only create SR for the operator log details only.
almost 10 years ago in IBM MAS - Oil & Gas / HSE 1 Future consideration

We request to add the properties of Multiplicity to Pin and Parameter

A parameter is a specification of an argument used to pass information into or out of an invocation of a behavioral feature. Generalizations • “MultiplicityElement (from Kernel)” • “TypedElement (from Kernel)” Business Justification: 1) Compliance...
about 5 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 3 Future consideration

Interfaces available for contracting at the ports

A port allows the contracting of the interfaces. Currently all newterm Elements that has the string "Interface" in their name is allowed to be contraced.This doesnt seem the right way to determine which modelElements can be contracted or not. This...
about 5 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 1 Future consideration

Reduce the number of confirmation dialog to one When moving Multiple Requirements

1. Select 3 requirements in Rhapsody browser view. Refer the attachment.2. Add these requirements as sub requirements by drag and drop. Now the Rhapsody will popup 3 confirmation dialogs. If 'n' number of requirements are moved then Rhapsody will ...
about 5 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 2 Future consideration