Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 5912 of 5912

ELM Doctor system analysis tool

We would like a feature added to create tool like another IBM tool that is client server based IBM l ClearCase tool called “ClearCase Doctor”. It would provide a systemic view of do you have the necessary minimal connections between servers and se...
over 1 year ago in IBM Engineering - Foundation/Common Services / Administration 0 Not under consideration

Can't Create View in Baseline then Export to Excel

In order to export a custom set of attributes from DNG in Excel, you need to create and save a View. If the stream you do this from is a baseline, then you can't create the view. This is a serious problem as once you baseline something, you can on...
over 5 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 3 Not under consideration

The enumeration values in RTC does not support sorting

When we add values to an enumeration there is no way to automatically sort them. It is very tedious to sort them manually.
over 2 years ago in IBM Engineering - Workflow Management / Administration 2 Not under consideration

Need a function to identify unused types and attributes to allow for quick cleanup and confirmance with templates

Currently the only way to remove un-used types is to manually go into every project, check if it is used (or try and delete it which does the check), if it is unused select delete. refresh the interface, and repeat. It takes approx 20 seconds per ...
over 2 years ago in IBM Engineering - Requirements Management DOORS Next / Administration 0 Future consideration

GWW - Calendar Export, control over log note to use and add long description to Communication Template

In Graphical Work Week application the Communication Template used by Export to Calendar function uses a relationship (WORKLOGAPPT) that is not specific to one log note record, it is also one that is used for other reasons meaning that it ought no...
almost 4 years ago in IBM MAS - Scheduler 2 Future consideration

Inability to order URL content on a Form

Being able to customize layout on forms for custom content and normal TRIRIGA content - right now we cannot control the order of content that gets displayed. • Sam says there a lot of work going on with the form builders
almost 4 years ago in IBM TRIRIGA Application Platform 1 Not under consideration

GWW – Work Priority column to retain background colour after you have assigned labor or crew

GWW – Work Priority column has a background colour. After you start to assign labor or crew the background colouration is lost. After completing all the assignments there is no priority colour, which makes it more difficult to find the high priori...
almost 4 years ago in IBM MAS - Scheduler 1 Not under consideration

It takes a lot of time to open a work item with many Attributes.

Customer spend more than 20 seconds each time they open a work item. The attached screenshot is a HAR and ccm debug log when opening 3 different Workitem at intervals of about 1 minute. In this example, it takes about 20 seconds, but sometimes it ...
over 1 year ago in IBM Engineering - Workflow Management / Work Items 3 Not under consideration

Update Change Set Access

Change Sets can be modified by anyone in DNG. Typically, this is controlled in that only by sharing the URL to the Change Set can someone obtain access to a Change Set. However, if you link a Change Set to a RTC Work Ticket, any user can access th...
over 5 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 2 Not under consideration

30 Day rolling rules

BEPA rules for 30 day rolling profile - Changing the period for adopting the rules.
over 1 year ago in IBM Envizi - ESG Suite / Interval Meter Analytics 1 Not under consideration