Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

IBM Engineering - Workflow Management

Showing 539

Users should only be able to view or locate another user if that user is part of a project area for which they have read access.

In IBM EWM, users can create multiple Project Areas, each with distinct access control levels. Currently, it is possible to assign users outside a Project Area as Work Item owners, even if they lack access to the Work Item. In such cases, the foll...
3 months ago in IBM Engineering - Workflow Management / Work Items 3 Not under consideration

Bulk Move Work Items between Project Areas

IBM Engineering Workflow Management should allow bulk migration of work items between different project areas. This feature is available via API, which is officially unsupported.
6 months ago in IBM Engineering - Workflow Management / Work Items 1 Future consideration

Query Git Pull Request attributes

The ability to query Git Pull Request attributes is essential for software release process, such as filtering based on Pull Requests merged in a specific release.
11 months ago in IBM Engineering - Workflow Management / Planning 2 Future consideration

Code review workflow must be consistent across code review cycles.

Currently the Code Review cycles are not consistent. The 1st Code Review cycle and subsequent Code Review cycles steps are ambiguous, the IBM documentation is also inaccurate as per skills Case xx4370. End users have to log into multiple interface...
over 1 year ago in IBM Engineering - Workflow Management / Source Control 1 Future consideration

A particular work item query takes 15-30 seconds in EWM when a work item type has 100 custom attribute.

A particular work item query takes 15-30 seconds in EWM when a work item type has 100 custom attribute. The cause of slowness in work item query is the following 2ms( for attributes check) * 118 (attributes) * 50 row = 11800ms = 11.9 sec. Please t...
about 2 years ago in IBM Engineering - Workflow Management / Work Items 2 Not under consideration

Bulk-copy/move of Work Items

In the same way that it is possible to copy/move a work item, it would be very useful to be able to do it for several. In fact, exporting/importing via Excel does not allow to keep the formatting of texts. It is very tedious to copy the work items...
3 months ago in IBM Engineering - Workflow Management / Work Items 1 Future consideration

変更セットの結合機能において、変更セットを自動で「完了」にさせるオプションを付ける

■課題既存の変更セットを結合し、新たな変更セットを作成した際、その変更セットのレビュー依頼を出したい。そのままでは変更セットは、「完了」していないので、レビューを依頼することができない。 ■改善案以下のオプション機能を追加する。「✅変更セットを結合した際、自動的に完了状態に遷移する」 ■効果変更セットを結合した際、すぐにレビューを依頼することができ、ユーザの操作を簡略化できる。
3 months ago in IBM Engineering - Workflow Management / Usability 1 Not under consideration

Fix String and HTML attributes

Refer to case: TS015771450 1. Setup an attribute in EWM of type 'Large String' and add to the Editor Presentation a. Note how when editing it, and adding text, once saved the text box expands to be much bigger than the text inputted, taking up unn...
10 months ago in IBM Engineering - Workflow Management / Usability 1 Future consideration

trigger operation advisor when stream custom attributes are modified

Currently operationAdvisors on "com.ibm.team.scm.server.modifyStream" are called for all modifications to a stream *except* when custom attributes are modified. This is a request to trigger the operation advisor in that case too. This is needed ...
about 3 years ago in IBM Engineering - Workflow Management 1 Future consideration

Code Review status dependency on Work Item status

Why is it useful? Effective EWM v7.x: Ø the Code Review Tool doesn’t leverage the work item’s lifecycle status or its approval mechanism like it did with the older RTC v6.x. Ø the Code Review Tool has its own in-built independent approval mechanis...
10 months ago in IBM Engineering - Workflow Management / Work Items 1 Future consideration