Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 5910

TRIRIGA CAD Integrator allows changed space names from the TRIRIGA Application synched to the floorplan layer (not via reporting themes/labels)

Similar to the FULL SYNC option in CAD Integrator, we can have an option for Name Sync or TRIRIGA Sync which will pull the updated space name information and update the floorplan's layer information.
over 3 years ago in IBM TRIRIGA Application Platform 0 Not under consideration

Restrict Ability to Move Appointment Made Jobs in Graphical Work Week

This was raised as case TS006502775 and IBM's response was: Bogdan (IBM)Aug 24, 2021, 15:35 Hi Darren, This case has been re-assigned to me. The question has been also raised by Andrew Jeffery and Level 3 stated this is working by design. Graphica...
over 3 years ago in IBM MAS - Scheduler 0 Not under consideration

Inspection page to display inspection form with different access control

Enhance the inspection page with different access control by form
over 1 year ago in IBM MAS - Mobile 1 Future consideration

Assets function to display the asset hierarchy

Enhance assets function to display asset hierarchy of selected asset
over 1 year ago in IBM MAS - Mobile 1 Future consideration

Additional Criteria for Approval Requirements

With the current limit of Module and Form for an approval requirement records the system is limited when an enterprise requests the ability to have multiple records using the same form approved in different paths.
over 8 years ago in IBM TRIRIGA Capital Projects Management 5 Future consideration

As an JazzAdmin I would l like to have an advanced property for attachments exclusively to Automated Results

Right now we have the advanced property com.ibm.rqm.planning.service.integration.AttachmentUtilService and that governs all the attachments within ETM. It is by default 50MB and has a limit of 2GB. If a user tries to attach something larger than t...
over 1 year ago in IBM Engineering - Test Management / Adapter Framework 0 Future consideration

DNG need Collection's baseline

From DNG V6, module baselines were replaced with project baselines. Project level baseline make individual management difficult. Accessibility is very low and hard to grasp activities for particular artifacts, module and so on. You can trace using...
over 6 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 3 Not under consideration

DNG need Folder's baseline

From DNG V6, module baselines were replaced with project baselines. Project level baseline make individual management difficult. Accessibility is very low and hard to grasp activities for particular artifacts, module and so on. You can trace using...
over 6 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 3 Not under consideration

Set a type for the userdefined metaclass "SwConfig"

It would be great if there is an API which is feasible to set the type of the swconfigobject.
over 1 year ago in IBM Engineering - Workflow Management / API 2 Not under consideration

Email from Comments should show when RESOLVED, not just "updated"

Whenever someone resolves a Comment, an email goes out to those directed in the Comment that the Comment was "updated". We would like the email to show that the Comment was "RESOLVED" instead. It should be added to the Subject of the email for bet...
over 3 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Not under consideration