Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

IBM MAS - Manage (Base)

Showing 1010

View Item Availability - Location Tab should have Reorder, Status and Site fields

The View Item Availability dialog is used widely. If the item has a quantity available and a current balance of zero, this does not stop a reservation from being created. When you are trying to stop items from being reordered you first unset the r...
8 months ago in IBM MAS - Manage (Base) / Supply Chain 1 Future consideration

Highlight error message in system generated email for Auto PM Work Order generation

Auto PM Work Order Generation process as per desired frequency is a standard Maximo functionality. Users receive an email message after the completion of PM Generation process that contains confirmatory message for work order generation and also e...
over 2 years ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Future consideration

Enhancing Material Allocation/Deallocation automation

The material reservation function in Maximo utilizes a ‘first come first served' approach to allocate material for work. Reallocation of material for work orders takes a considerable amount of manual effort by Supply Chain in order to align the pr...
about 4 years ago in IBM MAS - Manage (Base) 0 Future consideration

Testing Maximo in Japanese environment after applying fixes

Maximo Administrator has to update the data of MAXOBJECT to Japanese each time because the resource file is not translated to Japanese.This untranslated data always causes the Manage module to fail to start after the fixes are applied. Users canno...
8 months ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Future consideration

Caching of Sequences for Maximo tables to void performance issue.

Caching of Sequences for Maximo tables to void performance issue. Maximo / Manage installation should set the Sequence caching for all the Maximo/Manage table to avoid the performance issue. Currently we have to set the sequence caching for all th...
about 2 years ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Future consideration

Batch BIRT Reports Need Option So They Are Not Sent If No Records Returned

We need Maximo BIRT reporting to support not sending out a report if no data is returned. Currently the report is sent out regardless if any records are returned. This results in extra space being taken up on the server or email server to hold a r...
about 4 years ago in IBM MAS - Manage (Base) 2 Not under consideration

Restore capability to read logs from all Appenders in MAS

There is no way to get access to logs Appenders (Rolling and any custom appender). MAS allows reading only the Console appender (System.out) via S3 buckets. The option to read all appenders existed in Maximo 7.6.x. Please restore capability to rea...
9 months ago in IBM MAS - Manage (Base) / System Admin Config/Security 1 Not under consideration

Lease/Rental Contracts - Associated Assets - Addition of a multi-select lookup designed for the contract, replacing Select More Assets

When you select assets, you may have defined contract lines which reference rotating items, you must have authorized sites, therefore the Select More Assets dialog which does not even restrict to the assets of the organization of the contract is i...
9 months ago in IBM MAS - Manage (Base) / Supply Chain 0 Future consideration

7.6.1.3 - ASSETSPEC DISPLAYSEQUENCE is SMALLINT, but needs to be INT

We have GIS Pipelines that stretch over large distances. As a result, certain Pipeline Assets have thousands of Specs (10 Specs per length of pipe). When we create the Asset Specs through integration, the ASSETSPEC.DISPLAYSEQUENCE field is increme...
9 months ago in IBM MAS - Manage (Base) 2 Future consideration

Ability to manage Attached document folder in S3 storage

Need ability to manage Attached document folder in S3 storage.
over 3 years ago in IBM MAS - Manage (Base) 1 Not under consideration