Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 2924

Maximo Mobile new function - Use Maximo Mobile to verify that assets are in the correct location - we already did in a previous application

https://www.ibm.com/support/pages/maximo-mobile-asset-manager-audit-location-assets When you are performing an audit, you take inventory of all the assets in alocation. You are checking to ensure that all the assets are present and in the rightloc...
over 1 year ago in IBM MAS - Mobile 1 Future consideration

Orientation of drawings - ability to rotate between portrait and landscape

On our drawings that we upload from AutoCAD, our standard in CAD is to have it in landscape & every building having true north at the top of each floor print. We are finding is that in CAD it does this, but once we use CAD Integrator, it loads...
6 months ago in IBM TRIRIGA Application Platform 1 Future consideration

Ability to trigger custom code when application xml changes are saved - Graphite/ReactUI applications

Maximo currently doesn’t make it easy for administrators to trigger actions when changes are submitted for the Graphite/ReactUI applications. Some customers want to trigger custom code when an change is being prepared.They will use these triggers ...
over 2 years ago in IBM MAS - Common Services 0 Future consideration

Prevent deleting attributes with launch points, or drop launch points when attributes are dropped

Maximo allows administrators and developers to drop custom attributes which have Automation Script Launch Points registered against them -- without even giving a warning. Thus, Maximo can be left with a referential integrity problem, and Integrity...
about 8 years ago in IBM MAS - Manage (Base) 2 Future consideration

Allow for multiple separate instances of Envizi on internet tabs

This is hard to explain, but when I have Envizi open on two separate internet windows/tabs, I run into an issue where I'm trying to look at two different accounts. When I have two internet windows of Envizi open to review two separate accounts, ca...
3 months ago in IBM Envizi - ESG Suite / Base Platform 1 Future consideration

Have multi-unit selection (units of measure per commodity) options out of the box for manual data entry.

Why: We have locations across the globe. They all have utility companies that use different units of measure on their invoices. There is far less risk in human error by selecting a unit within manual data entry than asking the individual to do con...
6 months ago in IBM Envizi - ESG Suite / Scope 1&2 GHG Accounting & Reporting 2 Future consideration

Allow the company to select mtCO2e as a unit of measure to provide ultimate clarity of what tons are being used while also being able to match how many companies talk about, report on and have goals using mtCO2e as a standard method of communication.

Why: When companies are global in nature, we have some teams that use metric system and some that use imperial. It's hard to know what "t co2" means. Is it us tons? Is it metric tons? Make it very clear and match industry standards by allowing the...
6 months ago in IBM Envizi - ESG Suite / Base Platform 2 Future consideration

Provide public archive / restore APIs for all domains

We are currently working on a scripted solution to reduce the very large number of configurations in GC, DNG and ETM on our server. This activity is mainly based on several IBM recommendations that we have to keep the server clean and that so many...
8 months ago in IBM Engineering - Foundation/Common Services / Administration 0 Future consideration

Don't show non-working hours in Graphical Scheduler

Don't show non-working hours in Graphical Scheduler in the assignment view.If you indicate in the calendar that a workday is from Monday to Friday and 8 hours per day, the outside working day's and hours are still indicated.
6 months ago in IBM MAS - Scheduler 0 Future consideration

Indicator for existing links of any kind

Having an indicator attribute that shows the existence of any link is much faster than checking the artifacts links section in the sidebar or creating a filter for any possible link. Also OSLC links to RMM and ETM and other external links shall be...
6 months ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration