Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 2871

OCL verification support

Users can write their constraints by OCL(Object Contraint Language) on Contraint model for their model.However, they can't do verification of their models by their constraints.I want Rhapsody support to do verification of their models by constrain...
about 4 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 0 Future consideration

Remind users if a Change Set (CS) is older than one week and not delivered yet

Current behavior: Currently a lot of change sets are created by users but forgotten that they are open or not found any more, since it's not known how to find them.Finally we have a lot of old CS also containing changes no one knows if they are st...
12 months ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Dynamic ouput name for Report in Shared report

The idea is to rename the ouput file from shared report dynamically with variable set by users. For example : If my Variable is = 78, my ouput word named “SSUD-0000-VRD-ADST-6000076597_EdXX_DR_VNR-PROD-<iteration>_Report_RQM.doc” If my Varia...
3 months ago in IBM Engineering - Test Management / Test Execution 4 Future consideration

Require e-Signature on Completing Inspection from RBA/WorkCentre/Mobile

Problem Statement: When a technician is performing an inspection and completing it, they are able to confirm the inspection without an e-Signature. Business Impact : When Maximo is used by a clients in the Life Sciences domain, the data is strictl...
6 months ago in IBM MAS - Manage (Base) / Asset/Work Management 1 Future consideration

Allow Background Synchronization

When users of Maximo Mobile make updates in the application while in a disconnected environment the updates will automatically process once a connection is established. However, this will only happen if the application is in the foreground. Many o...
almost 2 years ago in IBM MAS - Mobile 0 Future consideration

More finely grained application of Roles and Permissions for artifacts and associated attributes to protect content from "unauthorized" editing.

This would allow the protection of specific content in DNG to the benefit of the team members working in the tool. Protection of "Content" and attributes from inadvertant (or intentional) changes by "unauthorized" team members by role would be des...
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Automated solution for fixing duplicate GUIDs

The following request comes from Continental AG (ICN 0A062NZ Here is part of their request: For several projects, we encountered this issue: when opening Rhapsody project, an error is given about duplicated GUIDs. Until now we tried to fix this by...
over 1 year ago in IBM Engineering - Systems Design Rhapsody/RMM / Other 2 Future consideration

Ability to trigger custom code when database configuration changes are saved

Maximo currently doesn’t make it easy for administrators to trigger actions when changes are submitted for database changes (in the database configuration application). Some customers want to trigger custom code when an change is being prepared. T...
over 2 years ago in IBM MAS - Common Services 0 Future consideration

Allow length control of multi-part text boxes

When configuring an application, the multi-part textbox if often the most useful tool to show a related value from a field. However, often one or both of these values are longer than the field. Please add 2 length attributes to the multi-part text...
over 2 years ago in IBM MAS - Manage (Base) / System Admin Config/Security 0 Future consideration

Automatic refresh of background data

Background data needs to be refreshed occasionally. The actual frequency will depend on the customer and the use case. We cannot rely on the users to initiate this manually, especially if we expect them to do so proactively before they enter an ar...
about 2 years ago in IBM MAS - Mobile 0 Future consideration