Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 5731

Report with Work Item Attachments

Team, There is no way to generate report based on Work Item Attachments.In RQM, you can generate a report from JRS which gives you the attachments in the form of URL.But this is not possible for RTC Work Items.
over 3 years ago in IBM Engineering - Workflow Management / Reporting 2 Future consideration

Improve XMI Importer to allow user to define types using same names defined in other namespaces

The type definitions in the XMI file are inside a profile with its own name (eg ScalarTypes). All the types defined within that profile are accessed by ScalarTypes::double and they each have their own ID#. Thus it should not be in conflict with th...
over 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Other 0 Future consideration

Please add a Go To Hotkey/keyboard shortcut to bring up the Go To search box

Classic DOORS had a Go To hotkey/shortcut of Ctrl+G available for use in modules to pull up the Go To search box for a specific ID. It was a really great feature of Classic DOORS. Not sure how this one got overlooked, but DNG doesn't have this in ...
over 3 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Not under consideration

Access to Doors OSLC Requirements with Rational Document Builder

We generate a Report with which lists the Object Identifier and Text of DOORS Requirements. To avoid use the doors-client on the server, we want to access the DOORS requirements using DOORS OSLC interface. According to Support, there is no officia...
over 3 years ago in IBM Engineering - Lifecycle Optimization Publishing 1 Not under consideration

Tagging all artifacts which are no longer present after a ReqIf import Not working as expected

Hi Team, There is a new feature (https://www.ibm.com/support/knowledgecenter/en/SSYMRC_7.0.1/com.ibm.rational.rrm.help.doc/topics/t_import_reqif.html) that allows tagging all artifacts which are no longer present after a ReqIf import, which helps ...
over 3 years ago in IBM Engineering - Requirements Management DOORS Next / Documentation 0 Not under consideration

Configurable display of non-working time in Graphical Scheduler

Could a configurable property be added to control the display of shading in the Graphical Gantt view for Scheduler. In some cases the zoom factor on a schedule causes the shading of the non-working time to overwhelm the colorization of the task ba...
over 3 years ago in IBM MAS - Scheduler 1 Not under consideration

TRIRIGA - Data uis Lost when Pasting Using Right Click if Paste string is Larger Than Max Field Size

When pasting data that is larger than the field size in TRIRIGA using Richt-Click>Paste, the entire string is pasted with no truncation or warning. However, when the record is saved, all of the data in the pasted field becomes blank. The system...
over 7 years ago in IBM TRIRIGA Application Platform 1 Planned for future release

Initial Link Validity is Suspect

Unfortunately this is the expected behaviour when setting link validity. Both for it's initial setting and any subsequent changes. "The system automatically sets links to Suspect when artifact contents change." I understand this would be very frus...
over 3 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Not under consideration

RS burger menu missing project areas

Case numberTS005134466 The new "burger" menu in RS in 7.0.2 does not match the menu of the remaining suite. Its only prossible to see the "all projects" and not the actual projects the user has access to.
over 3 years ago in IBM Engineering - Reporting / Report Builder 1 Future consideration

Enhance Initial Size of Nested Proxy ports

We are drawing nested proxy ports and even though the part is big enough, the initial size of the port is not big enough, thus resulting in labels of port to get align very close We expect that the initial size of ports should be decided based on ...
over 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 1 Future consideration