Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 2080

Increase timeout period

The short timeouts are wasting a lot of time having to close multiple tabs, log back in and click multiple links to get back where one was working. Please increase timeout to at least 3 hours, ideally 6 hours.
8 months ago in IBM Envizi - ESG Suite 6 Not under consideration

move work items from one Project Area to another

After few years of EWM use, some projects need to re-organise their Project Areas. Moving Work-items seems now essential. The plug-in developped on the release 4.0.7 https://jazz.net/wiki/bin/view/Main/BulkMoveWorkItemsBetweenProjectAreas should b...
about 3 years ago in IBM Engineering - Workflow Management 1 Not under consideration

Switching GC context in Doors Next Project area

When switching the global configuration context in dng, the user is shown a dialog with all possible gc streams he has access to. It is only possible to switch to those streams that the currently open dng stream had been added to. From a users per...
almost 2 years ago in IBM Engineering - Foundation/Common Services / Global Configuration Management 1 Not under consideration

GC link enhancement for compare configuration GUI

When linking between artifacts in different components using a global configuration, the compare configuration GUI currently says "The target of the link is not in the configuration". However, as of version 7.0.2 some of the behavior around links ...
almost 4 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 1 Not under consideration

Sort order when creating task

Sort order when crating Task, select owned byis uncomfortable
about 5 years ago in IBM Engineering - Workflow Management / Usability 3 Not under consideration

Incorrect recalculation of PO Cost if we change the currency more than one time into the Purchase Order application.

Steps to replicate: 1. Create a PO from Purchase Order application. System will automatically bring the currency defined in the Companies Master application. 2. Change the currency to USD and add a line with line cost as 100. System displays the T...
8 months ago in IBM MAS - Manage (Base) 1 Not under consideration

Type System Change History

Type System Property Changes must be tracked and made visible to determine who made what change when.
almost 4 years ago in IBM Engineering - Requirements Management DOORS Next / Administration 0 Not under consideration

Need support for embbeding paginated reports .

Need support for embbeding paginated reports . Under Power Report we need to have option for embbeding paginated reports.
8 months ago in IBM Envizi - ESG Suite 1 Not under consideration

Adding navigation to ERM wireframe components

System: IBM Engineering Requirements Management DOORS Next Actor: Wireframe offered by doors next has feature lagging of navigation IBM Engineering Requirements Management DOORS Next which provides feature to create mock screen does not have featu...
about 3 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 2 Not under consideration

Display the label of work item attributes (if set) in error messages for Required Attributes For Type and State

When you receive an error message about a required attribute not set, the attribute name is used. This is OK if the name of the attribute and the label of the attribute are the same, but is confusing if the label has been set to something more con...
almost 2 years ago in IBM Engineering - Workflow Management / Work Items 1 Not under consideration