Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 5781

triWorkRCA Pulished Name should include Control Number

Module: triCommonBusiness Object: triWorkRCA Please update the Published Name to include Control Number. This will prevent users from getting the 'record cannot be created with the same name as another' error.
about 4 years ago in IBM TRIRIGA Operations & Maintenance Management 0 Future consideration

CAD Integrator Batch Associate spaces to space groups with association filter

I am trying to attach spaces to space groups using Batch Associate. (IBM TRIRIGA > Edit > Batch Associate). Objective: List to show only the space groups tied to that specific floor (of the drawing). Currently all the space groups in the app...
about 8 years ago in IBM TRIRIGA Space Management 5 Future consideration

Add user synchronization for a basic user registry for Jazz Reporting Service

LQE is not build on top of the Jazz Foundation, therefore does not have the required services to provide user synchronization for a basic user registry.
about 4 years ago in IBM Engineering - Reporting / Lifecycle Query Engine 1 Not under consideration

Refactoring RM components with skew should be easier to resolve

I have a scenario where I have two DOORS Next modules in the same RM component that need to each occupy their own, individual RM components. So I create two new RM components with the same schema and clone each module into its own RM component (us...
about 4 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Not under consideration

Inventory Usage: Roll down the assetnum from the shipment creation to the inventory usage if the quantity is 1

On an inventory usage, if the equipment is selected during the shipment creation, the information isn't rolled down to the inventory usage.
about 4 years ago in IBM MAS - Aviation 1 Future consideration

Rhapsody should allow the linking of elements to remote requirement modules

Rhapsody currently allows a user to establish a link (Satisfies, etc) between a model element and a remote requirement in RM. Rhapsody should also allow the user to establish a link between a model element and a remote requirement module.
over 8 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Rhapsody Client 2 Future consideration

Enhance Telematics Set up to Allow for Creation of an SR

When setting up the options for telematics codes, you can ignore the code, capture a meter reading or create a work order when a code is received. We would also like the option to create a Service Request.
about 4 years ago in IBM MAS - Transportation 0 Future consideration

Ability to scroll in list when removing requirement from test step

Request to enhance the "remove individual requirement links" from a test step dropdown menu to allow scrolling down in situations where the full list of requirements may not fit on the page
about 4 years ago in IBM Engineering - Test Management / Usability 0 Not under consideration

Ensure tool availability in GA (same as RFE 127933)

In GS we have resource leveling and all work orders are timely arranged so that no resouces (craft, crew, tools) are overbooked.IN GA the work order are arraged to optimize travel time and optimal assignments. However only for labor and tools are ...
about 4 years ago in IBM MAS - Scheduler 2 Future consideration

Ability needed to mark work order Data Sheet NO ADJUSTMENT MADE & roll down to all asset functions

When populating data sheet data on work order, the no adjustment made must be applied against every asset function
over 8 years ago in IBM MAS - Manage (Base) 0 Future consideration