Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

IBM Engineering - Requirements Management DOORS Next

Showing 949 of 5983

Option to discard selective changes within DNG Change set while delivering it.

There should be a mechanism to select certain changes within a change set to be delivered and other to be discarded.
about 6 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 3 Not under consideration

RMM should contribute to the system defined DOORS Next field "Validity Summary"

The IBM Rhapsody® Model Manager (RMM or AM) application provides link validity status information only. Validity summary information is not available in DOORS Next.This breaks the assumption that ASPICE consistency can be achieved by referring to ...
about 1 year ago in IBM Engineering - Requirements Management DOORS Next / Integrations 0 Future consideration

DNG picture artifacts can be manually resized for size reconciliation in the document

After the DNG image is imported from word, the size of the image can not be adjusted manually, and the text is very inconsistent in the module, and the phenomenon of the picture is very large, and the page is reduced. The picture is reduced with t...
about 1 year ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Property to set tag's & view's description field size

We faced limitation of 449 symbols for tag's description field - in some cases it was not enough for us (eg. when we use tag's descriptions to store some technical information by extensions we develop). We'd like to have property (eg. in RM advanc...
over 2 years ago in IBM Engineering - Requirements Management DOORS Next / Administration 0 Future consideration

Send Email in a Review Not Open to All Participants since Review has to be Paused

Send Email in a Review is Not Open to All Participants since Review has to be Paused. Currently, when a review is active, the option to email participants is greyed out unless the review is paused. Only the Change Managers have the permission to "...
almost 5 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 1 Not under consideration

Cannot Create external Links from Requirement Management to ArchitectureManagement when changeset workflow is enabled in RM a

1.OSLC Link menu is disabled if we do not create a changeset in the Requirement Management Area2.If we create a changeset in RM(OSLC Link menu is enabled) and create a link to the External Project area e.g Architecture Management area then the ext...
almost 5 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 2 Not under consideration

Compare and work of/with changes is bad

After a re-import i tried to find out which changes occur. I looked for this in the change set and start to deliver - after clicking step by step i come to the overview that i can see the dedicated occured changes --> 532changes.The issue here ...
over 3 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 3 Not under consideration

Ability to stop users from viewing entire user registry

Currently, any user (not limited DOORs Next, but any application in the ELM/Jazz suite) can enumerate the entire list of users on the platform. This provides a fundamental security and data protection issue when providing access to multiple 3rd pa...
about 1 year ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Folder or artifact access for a limited period of time

Folder or artifact permission for a limited period of time
over 2 years ago in IBM Engineering - Requirements Management DOORS Next / Administration 1 Not under consideration

Allow adding modules to modules

Allow adding modules to modules.Use Case: Creation of a Super Document consisting of different other subdocuments. These subdocuments are located in different folders and belong to different teams and therefore have different access permissions.In...
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration