Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 2957

District Heating / Cooling on Utility Consumption Location Dashboard

As per recent update by IBM on our Database, a 'District Heating' and 'District Cooling' options were added under the SBS Connector. The issue now is that data, although properly setup on other places on Envizi, and also on the Reports, is not app...
3 months ago in IBM Envizi - ESG Suite / Base Platform 1 Future consideration

Accept "\n" for newline in "Edit > Find" dialogue.

Searching for newlines requires a different notation in different parts of the product. For example Filters accept the "\n" notation for newline. "Edit > Find" does not. Find will however work with "\u000A" - the hexadecimal code for Line Feed ...

I am requesting that PUB must be able to generate reports from DOORS showing "Validate By" links with ETM

It is useful because customers will not be able to see their links in their reports if this capabilitie is not fixed
7 months ago in IBM Engineering - Lifecycle Optimization Publishing / Document Studio 1 Future consideration

direct link between EWM CCM work item and the latest version of EWM SCM artifact

Request: direct link between EWM SCM artifact and EWM Work Items.
over 4 years ago in IBM Engineering - Workflow Management / Source Control 1 Future consideration

Improved data logging capability

Improving the activity data logging capability in order to facilitate the diagnosis when the tools are facing instability. This would allow us to be able to do proper analysis or pinpoint diagnosis on the potential root cause derived from the data...
10 months ago in IBM Engineering - Workflow Management / Administration 1 Future consideration

As an Admin, I would like to have Access Control based on each Test Artifact

In a Project Area we can have multiple teams, but not all teams necessarily should have access to everything in the Project Area. If we need to introduce a new team to the Project Area that should not have access to certain Test Artifacts, there i...
10 months ago in IBM Engineering - Test Management / Administration 0 Future consideration

Not Require MEP Spaces to have to a Space Classificaitons

95% of the time Rooms or Areas within Revit are what are Integrated to TRIRGIA to track space, not the MEP Spaces. Currently the BIM Integrator requires MEP Spaces with a MEP models to also have an associated Space Classification. This is useless ...
over 1 year ago in IBM TRIRIGA Application Platform 2 Future consideration

PM Forecasts do not reflect Dynamic

It seems the PM Forecasts remain being calculated as static. I tested it with two PMs having the same Job Plan assigned to it, with different Total Work Units assigned on Job Plan Sequence. Forecast Costs, when calculated, came up as identical.Her...
over 4 years ago in IBM MAS - Manage (Base) 3 Future consideration

REST API to fetch Architectural Element Data with time range filter on modified date

Since it is taking too much time to fetch the data using the existing RMM API'sWe want to fetch data using time range filter.
3 months ago in IBM Engineering - Systems Design Rhapsody/RMM / Integrations and APIs 1 Future consideration

SCM change set name not available in Jira

The name of some Jazz change sets from SCM are not displayed on Jira. Instead is displayed "No title available from resource" (as you can see in the screenshot). For other stories the name can be seen. The Jira story name is visible from Jazz.
3 months ago in IBM Engineering - Workflow Management / Usability 4 Future consideration