Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 3038

Need API to Manage DNG Type System

For deployments that involve more than 1 DNG server (associated with the same JTS server) that have the same type system, managing the type system is a currently a nightmare. The Need: An API that can be used to completely manage the DNG type syst...
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Administration 0 Future consideration

Add merge feature for Change Set deliveries which includes modification of attribute and artifact type properties to prevent destructive behaviour

Problem The change set in the source stream contains adding an attribute to an artifact type. While delivering the change, the artifact type configuration of the target child stream is overwritten and stream specific attributes are disconnected fr...
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Synchronize Timelines and Iterations

Request: Ability to synchronize timelines and iterations accross project areas and applications (e.g. allow same timelines in all projects in same lifecycle project) Use Case: We use many applications for one project. The timelines for all the app...
almost 2 years ago in IBM Engineering - Foundation/Common Services / Systems Engineering 1 Future consideration

SendFrom option for report scheduling

Maximo scheduled reporting only allows for the logged in users email to be set as the sendfrom email field. It would be preferable to allow the user to set or change the email send from field when scheduling reports. Allowing the user to set the s...
about 3 years ago in IBM MAS - Common Services 2 Future consideration

After adding JRS trend report to dashboard, allow to configure goal lines and date lines on dashboard

We are using JRS trend reports and would like to configure goal lines and date lines from dashboards using e.g. filters without going back to the JRS report to reconfigure these. But it seems that these lines do not get added as filters. For exam...
almost 3 years ago in IBM Engineering - Reporting / Report Builder 1 Future consideration

TRIRIGA Reporting - Branding

Bottom left of charts and in the TRIRIGA Reporting app - it says TRIRIGA REPORTING. We have worked really hard to rebrand TRIRIGA at our company to LMBuildings. I'm sure other companies have done something similar. It is very confusing to our end ...
over 2 years ago in IBM TRIRIGA Reporting 0 Future consideration

Move Parent Asset to new Location but Leave Children that have other Location

It is allowed to change location on Child Assets in an Asset Assembly.This can be usefull to have more detailed location information for these (grand)children.However when moving the Top Asset all Children will inherit the new Location. Organizati...
11 months ago in IBM MAS - Manage (Base) 0 Future consideration

Not Require MEP Spaces to have to a Space Classificaitons

95% of the time Rooms or Areas within Revit are what are Integrated to TRIRGIA to track space, not the MEP Spaces. Currently the BIM Integrator requires MEP Spaces with a MEP models to also have an associated Space Classification. This is useless ...
almost 2 years ago in IBM TRIRIGA Application Platform 2 Future consideration

Allow to generate only specific topics in the compare configuration report

The compare configuration report quickly becomes a very large report which can easily crash the DOORS Next server if sufficient heap is not allocated. But even if enough heap is allocated, the EDG component only has 8GB fixed heap and many reports...
over 2 years ago in IBM Engineering - Requirements Management DOORS Next / Performance 0 Future consideration

Provide option to split configuration comparison report output into multiple files with different section headings

This would be useful because the output of the report can be very large. For us, even a small report is unwieldy at more than 500MB. Having multiple files means that the report is much easier to open and share, rather than being one monolithic fil...
over 2 years ago in IBM Engineering - Requirements Management DOORS Next / Integrations 0 Future consideration