Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 5318 of 5318

Group Move to Dynamic Space Planning

Hi Team, As we are doing Dynamic space planning, when we are moving 100s of people in on a floor level. As a current process we have to drag and drop the people one by one. Which is very time consuming. We need to have a capability, to select all ...
14 days ago in IBM TRIRIGA Space Management / Dynamic Space Planning 1 Planned for future release

Change mode of floating windows to Read/Write

Currently with Rhapsody v10.0 (Build No. 10.0.0.R00_202402122040 64bit), it is possible to display diagrams in a floating window. However, this window and it diagram is in ReadOnly mode. By changing to Read/Write mode a floating diagram window, it...
27 days ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 1 Planned for future release

Enhancement request to have to consider Layout and Image for default display option

Rhapsody does not take over the display options for Layout&Image in case of Structure is selected. If the user opens the diagram again and drops the artefact with the previous stored options, Compartment is selected again. It works fine for ot...
about 2 months ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 2 Is a defect

MAS - More Search Fields access change in Manage application

In Maximo 7.6.1.2, More Search Fields are available on the List View of the respective application and on single click Users are able to open the dialog box to search the records. However in Manage, User has to click on the Quick Search Menu(3 dot...
4 months ago in IBM MAS - Manage (Base) / Asset/Work Management 2 Planned for future release

Function in workorder application "create jobplan from workplan" needs to copy attachment( doclinks) to Jobplan and jobtask

We plan alot of detailed work plans today on workorders that contains attachments for the tasks . For example a picture describing how to do or picture from a drawing. When using function to create jobplan from workplan none of attachments are see...
4 months ago in IBM MAS - Manage (Base) / Asset/Work Management 2 Under review

Need to add the JVM instance to Cron logs

Currently when troubelshooting issues with Cron runs we do not have access to the information of which JVM it ran on etc. This makes troubleshooting issues such as failures and long running Cron jobs extremely difficult.
7 days ago in IBM MAS - Manage (Base) / Reporting 0 Submitted

Users who are not members of a team area should be granted access to the team area dashboard

why is it useful?We were asked by IBM support to raise this issue as an IDEA. However we consider this a design defect because of the following reasons for benefit of doubt. testuser1 is a member of only TeamAtestuser1 is a not a member of the top...
8 days ago in IBM Engineering - Workflow Management / Usability 0 Submitted

Option to select and delete those Test Cases without Requirements during the reconciliation process

We observed QM Reconcile Requirements is not working as expected in 11P . Steps to Reproduce 1.In RM we have saved a shared view with a certain attribute selected as a filtering optionIn this view, we have now 10 requirements that are added to a T...

Testing Maximo in Japanese environment after applying fixes

Maximo Administrator has to update the data of MAXOBJECT to Japanese each time because the resource file is not translated to Japanese.This untranslated data always causes the Manage module to fail to start after the fixes are applied. Users canno...
8 days ago in IBM MAS - Manage (Base) 0 Submitted

Support for WEF, GRI, TNFD, ISSB frameworks

As EY are being enabled as an Envizi Partner, we need support for more ESG frameworks in the Sustainability Reporting Manager, since our teams are preparing disclosure reports based on those frameworks. Thank you!
7 months ago in IBM Envizi - ESG Suite / ESG Reporting Frameworks 5 Future consideration