Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 2955

Automated extraction of data from uploaded documents

To have the ability to upload an invoice to Envizi and for the pertinent information to be extracted would be a game changer and save so much time. The auditability of the data would be second to none and the way it would help avoid human errors w...
5 months ago in IBM Envizi - ESG Suite / Data Connectors & Integrations 0 Future consideration

Introduce an organization-level setting to consolidate all material needs into a single inventory usage document for work orders with multiple tasks

Current Behavior: When creating a work order with tasks under the Plans tab and associating materials with these tasks, the system currently handles inventory usage as follows: If materials are not linked to any task, all material needs are consol...
about 1 month ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Future consideration

Enable Excel formats for standard reports

Standard reports are, for the most part, only available to be downloaded in CSV format. This often causes issues when importing into Excel with data sets using non-English characters. It relates to, I think, encoding issues with UTF-8 vs. UTF-16 v...
over 1 year ago in IBM Envizi - ESG Suite 3 Future consideration

Include a Keyword in an other Keyword

In RQM (ETM) 7.0.3, there isn't the ability to have a keyword put inside another keyword. Is this functionality now possible on a newer release or planned for a future release? It will be very useful.
about 2 months ago in IBM Engineering - Test Management / Test Execution 0 Future consideration

Require the MBE report to be extended beyond 5 years

The market based emissions preferences only allow up to 5 years - our baseline year is 2019 so require the ability to have more than 5 years available. We have rasied this as an issue with our implementation team and the support team and have been...
3 months ago in IBM Envizi - ESG Suite / Scope 1&2 GHG Accounting & Reporting 1 Future consideration

Autogenerates "implemented by" links on the modified artifact, once the CS is delivered to the stream.

when linking CS to a work item we loose this traceability when the CS is delivered to the stream. It would be nice to have a feature that autogenerates "implemented by" links on the modified artifact, once the CS is delivered to the stream.
2 months ago in IBM Engineering - Requirements Management DOORS Next / Usability 2 Future consideration

Remove dependency in DOORS 9 client and server on outdated runtime libraries

Currently during installation DOORS 9 client and server deploy outdated runtime libraries in OS folders, and depend on them during runtime. Both product components should be updated in that no parts of the product depends on outdated runtime libra...

Resize image in DNG not working with Chrome or inline editing in Firefox

Description of Problem: User is not able to resize an image embedded in an artifact in Chrome since not resizing borders are shown around the image when editing. Steps to Reproduce: - Insert an image in an artifact (in my case i used Information a...
2 months ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Add Functionality to send reports with parameters from an escalation or add a condition field to report administration

Escalations should have a third tab next to Actions and Notifications to be able to send a report with its parameters. There a times where we want to monitor certain things where situations may or may not occur. Rather than having one communicatio...
4 months ago in IBM MAS - Manage (Base) / Reporting 0 Future consideration

Ability to sort exiting and new Attachments in Client Applications for Maximo Mobile

Attachments on the workorder are one of the crucial pieces of information that is used by the users of Maximo Mobile. When there are many attachments on the workorders, users are finding it challenging and spending lot of time to find the right at...
over 1 year ago in IBM MAS - Mobile 0 Future consideration