Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 5793

Change report scheduling date dialogue box to allow for annual report scheduling

The date schedule dialogue box for report scheduling in all applications is less detailed than in other places in Maximo (escalations, cron task instances), and does not allow for annually scheduled reports, such as run on May 15th every year.
over 3 years ago in IBM MAS - Manage (Base) 1 Future consideration

Flag to Identify that a Purchase Requisition (PR) was Generated by Reorder

System: 7.6.1 Description: Currently Maximo is configured to be able to run the reorder automatically via cron task or to run the reorder manually. When those are generated, the only thing that identifies that the PR was generated by reorder is vi...
about 5 years ago in IBM MAS - Manage (Base) / Supply Chain 2 Planned for future release

Animation window can not be resized

Please make the animation instance window resizable.
almost 4 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 0 Future consideration

White labelling - IBM Maximo Mobile

Our Client wanted white labelling the Ibm Maximo mobile application (ios and android) to "New Name" with their choice. Where they can do below : Change the login page to customer designed. Add Customer Logo everyplace where IBM's i.e. login page. ...
7 months ago in IBM MAS - Mobile 1 Planned for future release

The UX Work Planner App should be accessible to the Cloud Field Services Authorized Licence Users

Currently the client (HSE) Users with IBM Facilities and Real Estate Management on Cloud Field Services Authorized licence can NOT access the UX Work Planner app. The impact is that users are unable to do work task assignment through UX App. (Note...
12 months ago in IBM TRIRIGA Operations & Maintenance Management 1 Not under consideration

DNG Link to EWM File object

I want to be able to link to files in the repository instead of work items in the DNG link settings (eg Effects Requirement / Affected By). Please see attached file. This is good for user DNG+EWM who want asociate with one requirement and one file.
over 2 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 1 Future consideration

Implement collate/staple functionality when printing using the non-Java applet direct print

Direct printing with the system properties mxe.report.directprint.useapplet=1 and mxe.report.birt.PrintSeparateRecord=1 correctly collates/staples printed reports for each separate record (i.e. direct printing multiple work orders) only in Interne...
over 3 years ago in IBM MAS - Manage (Base) 0 Future consideration

Way to store all data of TC and TestScript used for each TCR

Hi, I m not sure about the selected category, it's related to TCR / Reporting. Use case: We have a test "TC 01" with : An attribut "TC indice" set to "A" A TestScript with a step 1 "Open Google.fr" We execute this TC/TS (using a TCER) to create a ...
5 months ago in IBM Engineering - Test Management / Test Execution 1 Not under consideration

Provide public archive / restore APIs for all domains

We are currently working on a scripted solution to reduce the very large number of configurations in GC, DNG and ETM on our server. This activity is mainly based on several IBM recommendations that we have to keep the server clean and that so many...
7 months ago in IBM Engineering - Foundation/Common Services / Administration 0 Future consideration

Code review workflow must be consistent across code review cycles.

Currently the Code Review cycles are not consistent. The 1st Code Review cycle and subsequent Code Review cycles steps are ambiguous, the IBM documentation is also inaccurate as per skills Case xx4370. End users have to log into multiple interface...
about 1 year ago in IBM Engineering - Workflow Management / Source Control 1 Future consideration