Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 5836 of 5836

Keep link to return in the Drilldown after consulting Item Master

Actually, first level of item is shown in the Drilldown. If user click on item, it is possible to "Go To Item Master" with the link at bottom of Drilldown. After this, the user can not return back in the item master with a shortcut in the top left...
12 months ago in IBM MAS - Manage (Base) 3 Not under consideration

Asset Manager (RBA) - Ability to Create SR or Create WorkOrder

There should be the ability to Create a Service Request or Create a Work Order when a technician is creating an asset or when an asset is being reviewed as part of another activity or as part of an asset audit. It could be a nearby asset that is n...
12 months ago in IBM MAS - Mobile 0 Future consideration

Disable or customize & translate email send from MAS during user creation

When a user is created at MAS level there is email send which contains the User details and it says for password, reach out to Administrator. This message is quite confusing for the end users and doesn't provide a process as if how a user can logi...
5 months ago in IBM MAS - Common Services 4 Planned for future release

Access to XML temporary files

It would be good for debugging abilities, to give access to temporary XML files generated from data sources. Especially when using DOORS classic as a data source, there are often no other means than to see the XML file to understand what prevent a...
5 months ago in IBM Engineering - Lifecycle Optimization Publishing / Usability 4 Not under consideration

Cursor positioning at the end when accessing large text attributes

When accessing an exisiting text attribute in a DOORS column the cursor goes to the front of the text by default. When the text is large the column is usually narrow and long. Normally the user wants to add something at the end of the text but the...

Option to remove add-on and industry solution products from MAS

We would like to have an option to remove add-on and industry solutions from MAS. Security guidelines prescribe the removal of products not, or no longer, used. Currently there is no other option than manual removal (SQL-scripts, remove files, etc...
7 months ago in IBM MAS - Manage (Base) / System Admin Config/Security 3 Not under consideration

When comparing configurations in DOORS Next provide a way for the user to specifiy attributes to ignore. Also need an option to ignore white space.

It will be very helpful to be able to ignore attribures such as Last Modified and Status as well as ignoring white space differences.
10 months ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Allow Group data lockdown

Hi Envizi Team, Understood that there is a lock down function in Envizi: https://knowledgebase.envizi.com/home/locking-down-data However, this is not very useful when it comes to reporting because we perform assurance in phases and we would like t...
over 1 year ago in IBM Envizi - ESG Suite / Base Platform 2 Future consideration

Code review workflow must be consistent across code review cycles.

Currently the Code Review cycles are not consistent. The 1st Code Review cycle and subsequent Code Review cycles steps are ambiguous, the IBM documentation is also inaccurate as per skills Case xx4370. End users have to log into multiple interface...
about 1 year ago in IBM Engineering - Workflow Management / Source Control 1 Future consideration

Condition Monitoring UI should have option to auto generate WO or not to check box when open WO exists

When adding a point, you should have a simple check box that will allow users to check it if they want the work order to generate if an existing work order exists for that point. Right now the CRON will generate regardless unless you script. Using...
7 months ago in IBM MAS - Manage (Base) / Asset/Work Management 1 Not under consideration