Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 2079

Set the name of a report using Report Resource based on an RPE template

I created a Report Resource based on an RPE template. When I use it, the report is generated correctly. But the name of the report is "Report.doc". When I export several Report, they all have the same name. It would be better if we could set the ...
over 2 years ago in IBM Engineering - Workflow Management / Reporting 1 Not under consideration

Out of the box "Prevent Editing" shall have an option to allow the addition of comments

1. We can use this precondition in much better way if it allows us to allow the addition of comments 2. Currently we need to achieve this via read only in status which requires alot of time to maintain specially in a scenario where we are adding a...
over 1 year ago in IBM Engineering - Workflow Management / Administration 3 Not under consideration

AM and QM links in local stream

We have enabled the GC for our project, in that case, we can only create the links between AM or QM with RM in the global configuration. Then we can't see any links information after we create a baseline in RM, it is not reasonable and should be c...
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Feature 1 Not under consideration

Allow return of rotating asset in Work Order Tracking > Actuals > Materials

Craft is used to using adding materials through work orders regardless of whether it is a Maximo item only or rotating asset. Although we can issue a rotating asset from a storeroom, the reverse is not possible (return rotating back to a storeroom...
almost 9 years ago in IBM MAS - Manage (Base) 2 Not under consideration

Allow view job plan status history when jobplan revisioning is disabled

You can only view job plan status history when you enable jobplan revisioning withing the Organization application You should be able to view the job plan status history regardless
over 1 year ago in IBM MAS - Manage (Base) / Asset/Work Management 1 Not under consideration

The enumeration values in RTC does not support sorting

When we add values to an enumeration there is no way to automatically sort them. It is very tedious to sort them manually.
over 2 years ago in IBM Engineering - Workflow Management / Administration 2 Not under consideration

Need option to restrict the access of change sets

AS of now there is no restrictions on who can make changes to a changeset. Not able to restrict the access of change sets and not able to see who did what change Reference PMR TS001057224
over 6 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 3 Not under consideration

OSLC : make "suspect contributor" available in API

a main feature of the OSLC interface is to provide information about links between Requirements and testcases ; An essential part of the information about the links are their validity, e.g. their "suspect state".But this state is not published in ...
almost 4 years ago in IBM Engineering - Test Management / Integrations 1 Not under consideration

Preventative Maintenance should inherit Active status' for PM's that are inactive and tied to an asset that has been made active again.

Reactivating PM's after an asset was made active again is currently a manual process and runs the risk of a PM not getting set to active. Thus causing a missed PM or CAL on an asset.
over 1 year ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Not under consideration

Changes (Nuc): Add ability to change/track changes to References/Drawings

We currently have the ability to stage and execute changes to Fields and Specifications in Changes (Nuc). We would like the ability to do the same for Drawings and References (DOCLINKS) on Locations. We can solve this currently with automation scr...
over 2 years ago in IBM MAS - Nuclear 1 Not under consideration