Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

IBM MAS - Aviation

Showing 25 of 5744

Time Zone Functionality for Flight Data in Flight Log Book

Currently, the departure time and arrival time are assumed by the system to be converted to system time by the user when they are being entered in the Flight Log Book. This singular functionality is a departure from the universal functionality of ...
over 1 year ago in IBM MAS - Aviation 1 Is a defect

Support of ASD format in Maximo Integration Framework

ASD exchange format is a standard in Europe for exchanging informations between companies in Aerospace and Defense sector. It's requested by our customers (Thales ...), prospects (Safran, Armies ...) as they must use this standard to exchange info...
over 1 year ago in IBM MAS - Aviation 2 Future consideration

Unlock 'Aircraft' and 'Equipment or Aircraft' field in Work Order Tracking for unscheduled maintenance.

When manually generating a work order (within the Work Order Tracking app) the 'Aircraft' and 'Equipment or Aircraft' fields are read-only. This makes it difficult to create ad-hoc work orders for unscheduled maintenance. Currently these fields ar...
5 months ago in IBM MAS - Aviation 1 Is a defect

Link technical publication to the OMP

Sometimes it is helpful to implement a Service Bulletin in the OMP e.g.: repetitive inspections. Most of the time you are performing the first inspection of the SB with the technical publication application (due to the revision process/interval of...
over 1 year ago in IBM MAS - Aviation 1 Future consideration

Changes to a parent configuration in a model roll down to children

The Models application is used to define the configuration of Aircrafts and Equipment. There are multiple configurations (variatns) for models and a large number of positions. Changes made to a position in the base configuration of another parent ...
over 4 years ago in IBM MAS - Aviation 0 Future consideration

automatic weight and balance calculation with taking into account the aircraft hierarchy and the role status of the AC

The A330 MRTT lives from his flexibility and the different roles how the AC can be operated. Role changes have always impact on the weight and balance and causes additional work in the system. My idea is: it should be possible to link or add the w...
over 1 year ago in IBM MAS - Aviation 0 Future consideration

Apply customer agreement on new Work Orders

We would like to have the option to apply the agreement to “New work orders (work orders without any estimates created, or all the work order (even if the estimates are accepted) or pending (work orders with pending estimates and ones without esti...
12 months ago in IBM MAS - Aviation 1 Future consideration

Aircraft creation via MIF process

An Planning or Engineering Manager or Data Manager must be able to prepare the Fleet of Aircraft in which a lot of equipment are installed in. To carry out this action, the user in charge of the data loading uses the Mxloader tool that uses object...
over 4 years ago in IBM MAS - Aviation 0 Future consideration

Calculated and display percent Work order completion in the Work Order Tracking application

In the Work Order Tracking application, Thales customer would like to display percent complete for work orders and tasks, and then calculate the percent complete for the parent work records and the schedule, helping planner to keep projects on track.
over 4 years ago in IBM MAS - Aviation 0 Future consideration

Storeroom restrictions are not applied in MIF

As detailed in the case TS005052239 : Storeroom restriction are correctly applied in Maximo applications. But theses restrictions are not applied during MIF interactions.
over 3 years ago in IBM MAS - Aviation 0 Future consideration