Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 5784

Allow the link between DNG reviews and Work Items in CCM

Business Need: In the same way that DNG changesets are allowed to be linked to CCM work items (usually Change Requests), DNG reviews should be allowed to be linked to CCM work items. This link would facilitate the traceability between the activity...
about 2 years ago in IBM Engineering - Requirements Management DOORS Next / Integrations 0 Future consideration

add Properties view back in menu of component and baseline to see the UUID of artifact

Before v7.0.2 we were able to view "properties" of a component or a baseline in EWM to see the UUID. Why it has been deleted in 7.0.2? This is usefull for users in Eclipse client.
about 2 years ago in IBM Engineering - Workflow Management / Source Control 3 Future consideration

Integration time POP email - Temps intégration emails POP (MV2-2097)

The crontask that integrates enova.ca@laposte.fr emails takes 5min at each pass since the MELPOSTE (IMAP) to .COM1 (POP) switch, whereas it is supposed to run every 2min. When I empty the inbox (manually moving emails to a sub-folder), the process...
about 4 years ago in IBM MAS - Manage (Base) 2 Future consideration

Framework compilation

With Rhapsody 9, a new feature checks if the framework is compiled before the application compilation. Also the place of framework is not the same and move to user folders.We need options or properties to come back to the old kind of installation ...
over 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Other 1 Future consideration

Improved messaging / error handling

Users attempt to retrieve data via the "map tab" from Work Order Tracking application. If for any reason the set of workorders contains one record reference that cannot be retrieved from GIS, The entire set fails. Example: Sample set of records fr...
8 months ago in IBM MAS - Spatial / Spatial 0

Operational Dashboard - KPI Comparison card - Select KPIs should show KPI Template as a column in left-hand panel

When editing the Operational Dashboard with a card type of KPI Comparison, the selection of KPIs to compare would benefit from showing the KPI Template that generated the KPI. KPIs generated from a KPI Template are likely to be candidates for comp...
8 months ago in IBM MAS - Manage (Base) / System Admin Config/Security 0 Future consideration

Containerization requires separation of duties

So MAS can only be run with full cluster administrator access? I thought we got away from "this has to run as root" thirty years ago. MAS has only one role? Then there are no separation of duties. This is a lift-and-shift monolith - not a containe...
8 months ago in IBM MAS - Common Services 1 Not under consideration

Ability to query EWM Code Review with status "abandoned"

We have deployed the Code Review tool inline with documentation guidance from IBM. Our developers would like to query work items with code review status "abandon". However in EWM documentation below it is missing to mention about "abandon" code re...
8 months ago in IBM Engineering - Workflow Management / Work Items 1 Future consideration

In Mas 8.11, End Measure Value should not be editable on point type feature label for linear assets.

In Case of Linear Asset, when user is trying to enter a meter reading and select a Reference Point as Point type feature Label, it is allowing user to enter the start measure and end measure both, whereas it should allow user only to enter a start...
8 months ago in IBM MAS - Manage (Base) 1 Not under consideration

Improving LQE historical trend reports

Current situation:- Historical data for LQE is not automatically available. We need to configure for every project that we need to capture historical trends (after configuration and collecting the data the results is still empty. The historical da...
over 3 years ago in IBM Engineering - Reporting / Lifecycle Query Engine 2 Future consideration