Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 5963

DNG issue with drag and drop for links

It seems that DNG logic doesn't allow for a drag and drop of a requirements from one component to another unless there is a change set in the side receiving the drop (even if the link will be stored in the starting (drag) side and has a change set...
about 5 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 1 Not under consideration

Move the position of Attachments icon in Details page to be consistent with other touch points

Attachments icon appears as a large icon at the bottom on WO Details page. User feedback indicated the preference to improve the experience was to place it in a manner consistent with other touch points. We have the OOB icon hidden and added a sma...
over 1 year ago in IBM MAS - Mobile 1 Not under consideration

Repair Tools Integrated in Application

All the various data repair tools that are available for DNG shall be integrated into the product, and delivered at GA time. This includes, but is not restricted to, the DNGRT tool, FolderIntegrityCheck, L3ToolEncryptPassword, LinkScanner, LinkSwa...
about 5 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 1 Not under consideration

Rich text descriptions out of RMM through RMM Rest API

Currently we use RMM Rest API to generate key documents for delivery to the customer. The RMM Rest API allows the ability to get description of an Architecture Element, but this is only plain text. We need the ability to get rich text out to reduc...
11 months ago in IBM Engineering - Systems Design Rhapsody/RMM / Integrations and APIs 2 Future consideration

Inspection Forms- ability to add an URL or attachment (template) to Media type questions..

By having an URL or attaching a template to the Media question, allows the technician to grab the latest version of a template or instructions. Then the technician can associated/upload the completed attachment to the question as needed.
11 months ago in IBM MAS - Mobile 1 Future consideration

Expand Scoring Group - Revisions

Need Understanding the impact of Scoring Groups changes have on Asset Condition and Custom Scores when where there are Revisions made. A Reliability Engineer may make a revision to the Scoring Group. (ex. Changed query, scoring contributors, or we...
11 months ago in IBM MAS - APM 1 Needs more information

Expand Scoring Group Information: Long Description

Need Why are more characters needed? Doesn't the scored asset list on the page already provide this list of assets? As is Currently - there is a 200 field for the description of the Health Scoring Group. To Be Increase the long description field i...
11 months ago in IBM MAS - APM 1 Needs more information

Configure timeout for REST datasource

Whenever a REST call GET is made on a REST datasource, there is a fixed timeout of 5 minutes. Some database do not always answer within 5 minutes, eg.g. some GET to ETM Feeds might take significantly longer.The Timeout for GET on REST datasources ...
11 months ago in IBM Engineering - Lifecycle Optimization Publishing / Integrations 1 Future consideration

SRMOBILE - Logout option is present inside the user profile and not on main menu/nine dots menu results in multiple clicks for the user.

Hello Team, In Service Requests role based application, the logout option is present inside the user profile and not on the main menu/nine dots menu which results in multiple clicks for the user.Could you please help us in changing the position of...
over 1 year ago in IBM MAS - Mobile 2 Functionality already exists

ProjectAreas can be split and move across servers

We need to be able to split a ProjectArea and move one part of it to another server / environment, while retaining full functionality with regards to links, reporting, traceability, history. The new server / environment can be an empty system, or ...
about 5 years ago in IBM Engineering - Foundation/Common Services / Unassigned 3 Future consideration