Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 5793 of 5793

Condition Monitoring Work Order Generation should work the same way as it does for the Cron Task LinearMeasurementWoGenCronTask to eliminate the inconsistency

Maximo Linear allows you to record multiple Gauge or Characteristics meter readings (measurements or observations) taken over a short duration of time. Some of these meter readings may be over the action limits. When using the action Generate Work...
about 2 years ago in IBM MAS - Manage (Base) / Linear 0 Future consideration

TRIRIGA Reporting: Limit the initial load of query data to improve speed

Every time you click to create a TRIRIGA report, or even edit a report - it loads up all the records before allowing you to take action on it. Should limit that to 1000 records or something to improve the speed of the tool. A lot of queries are bu...
about 2 years ago in IBM TRIRIGA Reporting 0 Not under consideration

Enable the ability for users to receive Single Digest Email for email notifications

As a user of the ELM application, To reduce amount automated notification emails from ELM application, I want to receive just one notification email per time period (e.g. daily), which contains all notifications for ELM tools since last email. I...
about 2 years ago in IBM Engineering - Requirements Management DOORS Next / Administration 0 Future consideration

Update the UI for reviews

User interface associated with reviews is deemed inadequate. We have received many requests from users to add filtering and other features to review interface.
about 6 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 3 Not under consideration

Report Scheduler link should be included in Global Menu

The only link to access the 'Report Schedule' is found by clicking the top level 'Tools' in the Global Menu. I would like the Global Menu to be consistent as need items are added. All links should be abailable within the Global Menu directly inste...
about 2 years ago in IBM TRIRIGA Application Platform 1 Not under consideration

RPE - reporting link validity within RM

I understand it is currently not possible to report on link validity for links between requirements within DOORS Next (i.e. not going out to RQM or other platforms). We would like to to use the link validity function between requirements, and an i...
about 2 years ago in IBM Engineering - Lifecycle Optimization Publishing / Unassigned 4 Not under consideration

Need to add a Rich Text Field to the Build Record Sections

Users are filling a lot of information for each Build Record. The Description field is too short to accommodate the information that they put into it. So, we will need a Rich Text field added to the Build Record item or have a larger dimension for...
about 6 years ago in IBM Engineering - Test Management / Administration 1 Not under consideration

Filtering on "Current" Iteration of timelines

Using multiple timelines in a project area is used to allow different teams in the project area to plan their work independently. Typical example for this is teams working in parallel on different versions or variants of the same product. Therefor...
about 2 years ago in IBM Engineering - Foundation/Common Services 3 Not under consideration

Change Self-Signed Certificate

IBM DOORS uses a self-signed certificate when TLS is enabled on the server. Currently there is no functionality to change that certificate to one that is signed by a local certificate authority. It would be good to enable this functionality.
about 2 years ago in IBM Engineering - Requirements Management DOORS/DOORS Web Access / Administration 0 Future consideration

CI - Space ID editing in table form

Background Summary: The current Batch Edit action for editing space ids is in a table form of Record Name (Tririga) and Current Field Value (dwg). The drafter can edit only one record at a time instead of editing several at a time by editing the C...
about 4 years ago in IBM TRIRIGA Space Management 3 Future consideration