Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 5912 of 5912

improve the usability of "Replace configuration" for SCM snapshot in Global configuration

Inside a global configuration stream, to replace an SCM configuration (either with a snapshot or with a stream), the selection window does not give enough information like created by, created on. As an enhancement, please refer to the selection fo...
5 months ago in IBM Engineering - Workflow Management / Source Control 3 Future consideration

DNG LQE Report don't have "Modified By" attribute

DNG LQE Report is not showing “Modified By” attribute. We are able to see “Modified By” attribute in DNG UI under requirement attribute type but the same attribute is not available in LQE report. DNG UI: LQE Report:Not able to find “Modified By” a...
5 months ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Add Actual minus Previous reading to the formulas catalogue

In the existing implementation of Monitor to calculate the difference between actual reading minus previous reading we need to use pandas. The formula would be something like: df['FLOW-RATE'].groupby(level='id').diff().round(1) This sintax is not ...
5 months ago in IBM MAS - APM 1 Not under consideration

Change format of automated emails

The automated emails contain the artifact name and any comment or message fields. These fields may have export control information in our case and because this is a SaaS application, we have a concern that the email may be routed through 3rd party...
10 months ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Support all DNG attributs and relations

Important parts of DNG information stucture is missing when trying to make reports in Report Builder LQE - Tags (Shared) - Artifact Format - Artifact Type (There is a Type attribut with garbage) - Modified by - A link from Base artifact to all Mod...
10 months ago in IBM Engineering - Requirements Management DOORS Next 3 Future consideration

Code review workflow must be consistent across code review cycles.

Currently the Code Review cycles are not consistent. The 1st Code Review cycle and subsequent Code Review cycles steps are ambiguous, the IBM documentation is also inaccurate as per skills Case xx4370. End users have to log into multiple interface...
over 1 year ago in IBM Engineering - Workflow Management / Source Control 1 Future consideration

ETM: Test Suite sort/filter function based on test case [Name/attribute/feature]

Right now, in ETM there is no way to sort filter option for Test Cases from Test suite. The need is to Identify test cases that need to be removed from one or more large test suites. Because of the limitation, users more easily create a new test c...
3 months ago in IBM Engineering - Test Management / Usability 0 Future consideration

Alert the dispatcher if a resource does not acknowledge work dispatched to them by a particular time.

The system shall have the ability to alert dispatcher if a resource does not acknowledge work dispatched to them by a particular time.
3 months ago in IBM MAS - Scheduler 0 Planned for future release

Support Encrypted ZIP Files

We got a request to extract the files from an encrypted ZIP file and provide them to a shared volume. Today Active Transfer does not support decryption during ZIP extraction. It would also be useful if there is an option to specify an encryption p...
3 months ago in webMethods Active Transfer 0 Submitted

RTC to support LDAP Channel Binding for end user authentication

LDAP Channel Binding feature creates a unique fingerprint for the LDAP communication. These fingerprints cannot be re-used as this would require establishing a new TLS tunnel every time a connection is established making it secure. The digital sig...
3 months ago in IBM Engineering - Foundation/Common Services / Administration 0 Future consideration