Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 2952

Template Issues in Rhapsody in C++

When using RiC++ it is possible to create directed associations to instances of templates. When the equivalent link is created between the respective objects the directed association is not recognised. It is possible to create a new association in...
over 5 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 2 Future consideration

Plan snapshots should be based on plans, not plan views

Currently, if you have Fetch Children on Demand selected, comparing the plan with a snapshot results in all the unfetched items to be reported as removed. This is counterintuitive, and it's effectively mixing the data layer (i.e. the plan) with th...
almost 3 years ago in IBM Engineering - Workflow Management / Planning 1 Future consideration

RPE launcher: ability to specify a variable via command line

Ability to start RPE Launcher with a command line by providing the value of a variable as a parameter Possibility to pass the ID to that variable using the command prompt like "-v variable value" as command line parameter. Maybe with the possibili...
almost 7 years ago in IBM Engineering - Lifecycle Optimization Publishing / Launcher 1 Future consideration

ETM documentation should specify that an option exists to edit existing Test Case Results (TCR)

Ref : https://www.ibm.com/docs/en/engineering-lifecycle-management-suite/lifecycle-management/7.0.2?topic=tests-running-test-cases Steps 1 - 11 are valid for Run Test Case workflow. Step 12 suggests an "Update.." to Test Case Result is possible.Th...
over 1 year ago in IBM Engineering - Test Management / Documentation 0 Future consideration

Attention Error showing with wrong display message for all Portfolio Security Groups

When user is restricted to one of the community access, He doesn't have access to other areas, where message should be shown as 'Unauthorized access - You don't not have permission to access this page' Instead it is showing as 'Due to either a ses...
almost 3 years ago in IBM TRIRIGA Application Platform 0 Future consideration

Import/Export Project Properties ( All types and Attributes)

Export to EXCEL for documentation : We need to export project properties in EXCEL so we can manage , review them for discussion and approval, and integrate them in upstream documentation for the organization to have as references . It is like hav...
almost 3 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Information on properties of a model element is different in RMM when compared to RDM

In RMM web we are not seeing any properties information (There is only basic info which is not sufficient). In RDM, we had full details as shown below in the RDM Screenshot. Full Properties details in RMM is very much mandatory for PS-XS as withou...
over 5 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Rhapsody Client 2 Future consideration

Fix the External link Navigation functionality so it does not display an ugly message on the original tab after it has opened the external url on a new tab

See IBM Case #TS013850718 for details. When adding new menu items to one of the navigation items.In the "Navigation Item Editor" We are selecting "External Url" in the Target DetailsThe Url we select is local to our company (does not matter though...
over 1 year ago in IBM TRIRIGA Application Platform 1 Future consideration

Backup and Restore

With the increasing amounts of important data that is stored in MVI, it would be best to have established backup and restore procedures. It would be even better if this could be done on a user level, rather than a full cluster level.
almost 3 years ago in IBM MAS - Visual Inspection / MVI 0 Future consideration

Option to disable the copy of multiple assets when creating follow-up Work Order

Maximo works in a way, that if you have a Work Order with populated multiple asset section and you create a follow-up Work Order on such Work Order its copies all of the multiple assets from the originator to the follow-up Work Order.The inconveni...
over 1 year ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Future consideration