Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 2968

Integrate with password management tools like Vault

With MAS there are options to store database passwords as K8s secrets, but there are no options to store and retrieve passwords from password management tools like vault
11 months ago in IBM MAS - Common Services 0 Future consideration

[DNG] Archiving of Components / Stream Should be Possible without Discarding Change-sets

Use Case : - IBM recommendation is to archive unwanted streams / configurations which is not needed for the customer usage. - Current Technical Challenge from Tooling Point of View- Application is blocking the archival of components which has Open...
11 months ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Possibility to add CSV option while scheduling a report in Maximo.

Hello Team, In Maximo Application Suite, while scheduling reports CSV file format option is not present. Our client needs .CSV file formt option while scheduling report.Could you please help us in adding a .CSV file format option while scheduling ...
almost 2 years ago in IBM MAS - Scheduler 1 Future consideration

copy of Multiple test script at a time

Hello, we see it is difficult to copy one test step from a test script to another test script and also going through same tab. So our proposal is to have drop and drag kind of thing to copy one test steps to another and also to copy multiple test ...
almost 2 years ago in IBM Engineering - Test Management / Usability 0 Future consideration

Maximo Security Group should allow creation of Read-Only user with read-only restriction on all related applications

When configuring security groups in Graphical Scheduler for Large Projects, it is possible to create a "read-only user" but this user can still apply modification to the Graphical view. The changes in the graphical view are not committed to the da...
11 months ago in IBM MAS - Scheduler 0 Future consideration

Enhance performance on Work Order Tracking application

When working in the WO Tracking application and listing all Work Orders under the menu option : create a new record or open an existing one / on predecessors field --> Select Predecessors / Select More Work Orders, no option to filter the resul...
11 months ago in IBM MAS - Scheduler 0 Future consideration

Improve wireframes resolution

Client asked if wireframes resolution can be improved, because when they are included in any artifact, the resolution is very low and we can't resize them as we can do with images.
almost 2 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

MEC should prompt user to select a workspace on opening

When Method Composer 7.6.2 is opened, it always opens a default workspace in the user's home area. If you need to use a different workspace, that wastes time waiting for the default workspace to open and then switching workspace. It's also confusi...
almost 3 years ago in IBM Engineering - Lifecycle Optimization Method Composer / Usability 4 Future consideration

Rhp 9.0 -> Panel diagram::Widget explicit code execution

Having a container (C++17 map) with attributes, the attributes should have been displayed on the panel diagram, currently the attribute as it is, it's not modifiable nor displayable by the panel diagram widgets.A C++ method should have be called w...
over 4 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Code and Execution 1 Future consideration

Comparing 2 changesets for the same element in the browser

In the Design Manager web browser, for one Rhapsody element changed several times, we can:- list and display the changesets using the "Explore Change Sets" option,- in front of the last changeset expanded, display the full history using the "Show ...
over 8 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Web Client 2 Future consideration