Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

All ideas

Showing 3019

Assets application to show that an asset is part of an active lease/rental contract

Assets are leased and rented, and you need a visual indicator to know that you should look up the contract details to determine whether you are allowed to perform maintenance (or not), perhaps review properties or terms and conditions. From the As...
9 months ago in IBM MAS - Manage (Base) / Asset/Work Management 1 Future consideration

ERM/RM should show the JIRA links in the Change Set section

Why is it useful ?As per current product design of ERM , despite presence of integration with third party tool such as JIRA and subsequent links to Work items in JIRA , change set section is left blank and shows no links are present. However , thi...
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Integrations 0 Future consideration

Integration time POP email - Temps intégration emails POP (MV2-2097)

The crontask that integrates enova.ca@laposte.fr emails takes 5min at each pass since the MELPOSTE (IMAP) to .COM1 (POP) switch, whereas it is supposed to run every 2min. When I empty the inbox (manually moving emails to a sub-folder), the process...
over 4 years ago in IBM MAS - Manage (Base) 2 Future consideration

Cross-component ReqIF

DOORS Next can export a component with its internal links to a ReqIF file. But it can't export two DOORS Next, and more importantly : the links between these two components. This enhancement could allow users to use ReqIF to export DOORS documents...
about 2 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 1 Future consideration

EWM does not allow for pre-configured attributes which shall appear for the workitem copy function.

It would be useful to be able to customize which attributes get included in the list of attributes to choose from when you do a workitem copy. This would give the ability to limit or add attributes clients should or should not copy from previous.
9 months ago in IBM Engineering - Workflow Management / Work Items 1 Future consideration

Remove restriction of Filters on string attribute values only consider the first 449 characters

Currently string type attributes are usable only for their first 449 characters, since anything over that limit cannot be used in filtering in UI. This is very confusing for users, imagine e.g. "Change History" attribute which will have quite many...
9 months ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Improvement to Excel output from Publishing

In the Excel output generated from Publishing, the images are floating and the table will spread across multiple columns and rows. Thus the Excel export from Publishing is not really useful. It will be good if the images and tables from DNG (or ET...
9 months ago in IBM Engineering - Lifecycle Optimization Publishing / EDG 2 Future consideration

Retain the PM History data when changing the PM status to INACTIVE or DRAFT

Whenever the PM status is changed to INACTIVE or DRAFT, simply retain the data that has already been generated. This will aid in any future auditing by having one place to go to without the need of creating a report or a new tab in the PM (Tr) app...
about 2 years ago in IBM MAS - Transportation 1 Future consideration

Inventory Counting (RBA) - Count Book Counting should show Asset Number and Tag Number as these are most likely barcoded fields for assets

In the Role-Based Application Inventory Counting and using Count Books option, a count book can have count book lines which are assets. Rotating assets will often be labeled so that they can be tracked during repairs. ASSETNUM and ASSETTAG are the...
over 1 year ago in IBM MAS - Mobile 2 Future consideration

When there are non-ASCII characters in the ReqIF import file path.

As shown in the screenshot in the attachment, if there are non-ASCII characters in the import file path, the import operation cannot be completed. There are situations where customers cannot use the English path, so would like to see improvement i...
over 1 year ago in IBM Engineering - Requirements Management DOORS/DOORS Web Access / Import 0 Future consideration