Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

IBM MAS - Transportation

Showing 26 of 5846

User will be able to add multiple meter readings and the filter should work in Asset (TR) Aplication

User will be able to add multiple meter readings and the filter should work in Asset (TR) Application.
8 months ago in IBM MAS - Transportation 0 Future consideration

Fuel Transactions import(Tr) application is only used on loading the Asset meters. Need support to load the Location Meters also. Specially it should work like how we are doing manually in Locations applicaton. It has to copy the meter readings to the assets in that location.

It's useful and it will reduce manual work for the operators. Because its difficult to collect each and every asset's meter reading. Instead just updating the location meter , should update multiple assets under it.
11 months ago in IBM MAS - Transportation 1 Not under consideration

Inventory Counting (Tr) – Hardcoded Accuracy unable to be over 1000

Open Inventory Counting (TR) Create a new Count Book and enter Storeroom =CENTRAL, Selection Criterion = ITEM Save the record and change status to APPR On the tab of Count Book Lines If enter Physical Count = 19, and Accuracy = 950, no error messa...
over 2 years ago in IBM MAS - Transportation 0 Is a defect

Add the ability to purchase assets based on Asset Templates

I can purchase based on a rotating item number and then create serialized assets. However, for fleet assets, I typically use Asset Templates to create serialized assets and also apply PMs, spare parts, meters, etc. I need the ability to link the A...
almost 4 years ago in IBM MAS - Transportation 0 Future consideration

Have the Maximo Linear features add to all corrosonding Maximo for Transportation apps

My client is using the Maximo for Transportation apps as their prime applications and requires the use of the Maximo Linear features such as dynamic job plans. Whilst it's possible to manually add the necessary screen and security changes, custome...
over 1 year ago in IBM MAS - Transportation 0 Future consideration

Do not reset to zero the PM counters when an asset is moved to other location

Currently, when an asset is moved from one location, the counter resets to zero and must be manually updated at the new location. On average, an asset can change location 3 times in a period of one year and the current process of reset the coun...
about 3 years ago in IBM MAS - Transportation 1 Not under consideration

Missing coverage line after Asset Warranty Contracts (Tr) revision

After an Asset Warranty Contrats (Tr) revision, coverage lines added with the revision are not applied to existing assets.
over 3 years ago in IBM MAS - Transportation 0 Future consideration

Retain the PM History data when changing the PM status to INACTIVE or DRAFT

Whenever the PM status is changed to INACTIVE or DRAFT, simply retain the data that has already been generated. This will aid in any future auditing by having one place to go to without the need of creating a report or a new tab in the PM (Tr) app...
almost 2 years ago in IBM MAS - Transportation 1 Not under consideration

Retain the PM History data when changing the PM status to INACTIVE or DRAFT

Whenever the PM status is changed to INACTIVE or DRAFT, simply retain the data that has already been generated. This will aid in any future auditing by having one place to go to without the need of creating a report or a new tab in the PM (Tr) app...
almost 2 years ago in IBM MAS - Transportation 1 Not under consideration

Have the work order number recorded for gauge and characteristic meters when entered from the Enter Meter Reading menu on an asset or location field.

When a meter reading is entered using the "Enter Meter Readings" More Actions menu, the entry is posted to the WOMETER table. This allows for backtracking from the METERREADING or MEASUREMENT table to recognise all readings done from a work order....
about 2 years ago in IBM MAS - Transportation 1 Future consideration