Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 2885

Gantt Chart Advanced Controls

Enable controls that determine which lines in the Gantt chart can be modified by the planner. An example. If Maximo creates a regulatory work order (worktype - Regulatory PM) we would not want someone moving that dates of those jobs. If the work o...
over 2 years ago in IBM MAS - Scheduler 1 Future consideration

Lease/Rental Contracts - Handling of asset rentals for a small number of days

In the current Lease/Rental Contracts the Term is in months. When hiring equipment, from tool hire or plant hire companies, the term may be measured in days with only one payment or a few payments including a refundable deposit. Ideally you would ...
6 months ago in IBM MAS - Manage (Base) / Supply Chain 1 Future consideration

Lease/Rental Contracts - Add the term and number of payments to modifiable fields on the Associated Asset to provide greater flexibility

The term and number of payments are on the lease/rental contract header which means that if the term or number of payments will differ for an asset you need to create another contract. This can lead to many contracts with the same vendor, each wit...
6 months ago in IBM MAS - Manage (Base) / Supply Chain 2 Future consideration

TC selection based on TC attributes during TSER creation

While generating a Test suite execution record, A filter has to be introduced where Test cases can be chosen based on Test Case attributes using the filter.
6 months ago in IBM Engineering - Test Management / Test Execution 0 Future consideration

Reconciliation option not available in Inventory Counting on Maximo mobile.

Reconciliation option should be available on Maximo Mobile for offline and online reconciliation.
over 1 year ago in IBM MAS - Mobile 1 Future consideration

Need of the nightly/daily batch options in Tririga to process CPU Intensive workloads

Implementation background - As part of our application module rollouts and enhancements, we have enabled bulk processing on several CM, PM, and FM related functionalities. For example, CM users can upload excel sheet with capital projects and crea...
almost 2 years ago in IBM TRIRIGA Application Platform 5 Future consideration

DNG to detect and avoid creating links to same artifacts

Hello team, Currently, whenever we perform a merge or a delivery of artifacts, the tool doesn't detect if there are any links already present in the artifact and instead considers the link as new each time, thus adding the link again. So, every ti...
6 months ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

The Locate tool in version 10.8/3.8 needs an Export option for the floor directory just like the previous locate tool had.

The customer who uses this tool would regularly use the loacate tool to search for buildings and export the personnel directory for each of the floors. This feature was dropped from the locate tool when they upgrade to 10.8/3.8 last year.
over 2 years ago in IBM TRIRIGA Application Platform 1 Future consideration

Start Center Portlet Graphs for Working Impact Status

There is a use case for having a start center portlet listing open work order details with their associated Working Impact status. The start center portlets can currently only display a graph from relationships where the parent's attributes direct...
12 months ago in IBM MAS - Nuclear 0 Future consideration

Enable Linking across Cross Server Projects/Components with Link Constraints to improve Traceability whilst increasing Linking Accuracy

Scenario : GC : [Component A_C1 Initial Stream , Component Z_C1 Initial Stream] Server 1, Project A, Component A_C1 Artifact Type : SubSystem Requirement Specification, SubSystem Requirement Link Constraints [SubSystem Requirement Satisfies System...
12 months ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration