Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 5983 of 5983

Allow length control of multi-part text boxes

When configuring an application, the multi-part textbox if often the most useful tool to show a related value from a field. However, often one or both of these values are longer than the field. Please add 2 length attributes to the multi-part text...
almost 3 years ago in IBM MAS - Manage (Base) / System Admin Config/Security 0 Future consideration

We'd like to be able to use PowerReports with updated data in real time

We have been using PowerReports for reporting and find them helpful, but not having them update for 24 hours after the underlying data is updated is very frustrating and slows down our process greatly.
9 months ago in IBM Envizi - ESG Suite / Base Platform 2 Not under consideration

Be able to move test executions retrospectively

The idea is to be able to move test executions retrospectively. For example after a standalone execution, into a specific test plan or into a specific test suite execution record. This is needed so that test suite execution report (for example)is ...
9 months ago in IBM Engineering - Test Management / Test Execution 0 Future consideration

Ability to trigger custom code when database configuration changes are saved

Maximo currently doesn’t make it easy for administrators to trigger actions when changes are submitted for database changes (in the database configuration application). Some customers want to trigger custom code when an change is being prepared. T...
over 2 years ago in IBM MAS - Common Services 0 Future consideration

trigger operation advisor when stream custom attributes are modified

Currently operationAdvisors on "com.ibm.team.scm.server.modifyStream" are called for all modifications to a stream *except* when custom attributes are modified. This is a request to trigger the operation advisor in that case too. This is needed ...
about 3 years ago in IBM Engineering - Workflow Management 1 Future consideration

Share "Manage Project Properties" from a master project

All settings done in "Manage project Properties" is not inherited when you share a process of a project area.
about 7 years ago in IBM Engineering - Test Management / Usability 1 Not under consideration

Communication Protocols for Semiconductor Assets/Tools in MAS Monitor Edge Data Collector

I am currently leading a Go-To-Market (GTM) campaign for the semiconductor manufacturing industry, where I am engaging with clients to implement MAS for their shop floor tools and assets. The goal is to track key metrics such as Overall Equipment ...
3 months ago in IBM MAS - APM 2 Functionality already exists

Add the Asset.FailureClass (Failure Code) to the Asset Template Application

Failure code is used extensionally in Asset Managment, it needs to be added to the Asset Template application for data efficiency.
6 months ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Future consideration

SERVICEABILITY - Filter Synchronous Message tracking ability (monitoring in MAS)

Asyncrhonous Message tracking can be activated indepenendly via Publish Channel/ Enterprise Services. For Synchronous Message tracking specifically rest, there is no filtering and all is done via the System property mxe.int.trackrestrequests. In M...
6 months ago in IBM MAS - Manage (Base) / Integration 2 Planned for future release

Provide logging that captures Access Rights changes

This is a regular request from customers. This customer is particularly interested in access rights changes made to Groups. There is no way to track who has made changes at the moment.
almost 2 years ago in IBM Engineering - Requirements Management DOORS/DOORS Web Access / History/Audit 0 Future consideration