Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 6065

Customer can load existing RCM/FMEA data into custom strategies

Customer can load existing RCM/FMEA data into custom strategies
3 months ago in IBM MAS - Reliability Strategies 1 Planned for future release

We'd like to be able to use PowerReports with updated data in real time

We have been using PowerReports for reporting and find them helpful, but not having them update for 24 hours after the underlying data is updated is very frustrating and slows down our process greatly.
10 months ago in IBM Envizi - ESG Suite / Base Platform 3 Not under consideration

Be able to move test executions retrospectively

The idea is to be able to move test executions retrospectively. For example after a standalone execution, into a specific test plan or into a specific test suite execution record. This is needed so that test suite execution report (for example)is ...
10 months ago in IBM Engineering - Test Management / Test Execution 0 Future consideration

More finely grained application of Roles and Permissions for artifacts and associated attributes to protect content from "unauthorized" editing.

This would allow the protection of specific content in DNG to the benefit of the team members working in the tool. Protection of "Content" and attributes from inadvertant (or intentional) changes by "unauthorized" team members by role would be des...
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Option to keep device offline

Create the manual option of keeping the equipment in offline status. And only be synchronized when the client enables the connection.it' is possible create a button with an on/off option to connect to the network.
over 1 year ago in IBM MAS - Mobile 2 Not under consideration

improve the usability of "Replace configuration" for SCM snapshot in Global configuration

Inside a global configuration stream, to replace an SCM configuration (either with a snapshot or with a stream), the selection window does not give enough information like created by, created on. As an enhancement, please refer to the selection fo...
7 months ago in IBM Engineering - Workflow Management / Source Control 3 Future consideration

DNG LQE Report don't have "Modified By" attribute

DNG LQE Report is not showing “Modified By” attribute. We are able to see “Modified By” attribute in DNG UI under requirement attribute type but the same attribute is not available in LQE report. DNG UI: LQE Report:Not able to find “Modified By” a...
7 months ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Add Actual minus Previous reading to the formulas catalogue

In the existing implementation of Monitor to calculate the difference between actual reading minus previous reading we need to use pandas. The formula would be something like: df['FLOW-RATE'].groupby(level='id').diff().round(1) This sintax is not ...
7 months ago in IBM MAS - APM 1 Not under consideration

direct link between EWM CCM work item and the latest version of EWM SCM artifact

Request: direct link between EWM SCM artifact and EWM Work Items.
almost 5 years ago in IBM Engineering - Workflow Management / Source Control 1 Future consideration

Usage of PUB scrips in RPE by scriptname and not by ID

If you are going to use javascript from PUB (assets --> scripts) in RPE the you can add a javascript with content similar to that: <Script src= "library://api/scripts/104"></Script>. Unfortunately you have to use the key instead of ...
almost 2 years ago in IBM Engineering - Lifecycle Optimization Publishing / Unassigned 6 Future consideration