Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 21

Contribution Percentage value at station and/or the CU level in CU Estimating

Business Case: When establishing CIAC (Contribution in Aid of Construction) cost through CUE in some cases a customer may only be required to reimburse us a certain percentage of a span or CU. For example, if the customer is required to reimburse ...
3 months ago in IBM MAS - Utilities 2 Needs more information

new field for versioning Assets in Document Builder

current situation: If an report is executed in the Document Builder and a document gets generated then it is not documented which dta file version, which word template version and - if used - which javascript library versions were used to gener...
28 days ago in IBM Engineering - Lifecycle Optimization Publishing / Documentation Builder 6 Needs more information

Alignment of Envizi Power Reports with Custom Fiscal Year Calendar and Backdating Functionality

The current configuration of Envizi Power Reports, which currently spans from January to December. However, our organization follows a fiscal calendar that commences in July and concludes in June. To ensure accurate reporting and better alignment ...
about 2 months ago in IBM Envizi - ESG Suite 1 Needs more information

No multi-component-set view

The inadequacy of the change set views and exports when it comes to links to/from other components. i.e. not having a “multi-component-change-set” sort of view.
28 days ago in IBM Engineering - Requirements Management DOORS Next / Usability 1 Needs more information

Create Report Doesn't have all the information required to do the review

On Compare ConfigurationsMissing text/attributes. Not enough context to review the changes. Will also fail on modules with broken links.
28 days ago in IBM Engineering - Requirements Management DOORS Next / Usability 1 Needs more information

Reports take a long time

For a review packet. Reports take a long time. Takes 20 min. Last day of sprint it is a long time to wait, especially if multiple modules at 20 min each it adds up.
28 days ago in IBM Engineering - Requirements Management DOORS Next / Performance 1 Needs more information

Multiple changesets mixed in diff

History view does not separate change sets so the changes can be interleaved, thus making it hard to see just the changes for a particular change set.
28 days ago in IBM Engineering - Requirements Management DOORS Next / Usability 1 Needs more information

Top level quick view does not always show differences

Not easy to tell what link was removedTrying to map module to component doesn't show and Quick Search fails.Ideally would be similar to the module view where can bring up the detailsLinks do not show in high level view Top level view shows there a...
28 days ago in IBM Engineering - Requirements Management DOORS Next / Usability 1 Needs more information

Quick view does not highlight differences, but detail view does-Hard to quickly see diffs

Have to use multiple views in order to get the true representation of what changed.In high level view, it might be showing the difference, but not highlighted. Have to go to detailed view and in that detailed view it does correctly highlight the d...
28 days ago in IBM Engineering - Requirements Management DOORS Next / Feature 1 Needs more information

Hard to audit changeset after delivery

Difficult to audit a changeset after delivery.Harder after delivery when trying to go back to see what changed. How to diff?No compare with stream option. Instead need to piece meal the changes together. Piece together starting and ending state of...
28 days ago in IBM Engineering - Requirements Management DOORS Next / Usability 1 Needs more information