Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 2839

Lock or freeze the ETM Local Stream

Currently, we are encountering an issue where the ETM stream is unintentionally changed or modified by users, leading to incorrect information being delivered. We may not be aware of such modifications. To prevent data corruption caused by users, ...
10 months ago in IBM Engineering - Test Management / Configuration Manager 0 Future consideration

Document how to recognise common transactions in server and client logs at each log level, as a means to better understand logs

Depending on log level, DOORS client and server record transaction logs that can be used to understand events that took place leading to certain behaviour, data states, errors, crashes etc pp . It would be useful to document the most common activi...

Improve Layouts and Reroute Lines function of Rhapsody

Problem: The current solution from IBM for layouting (Hierarchical, Othogonal) and reroute lines is not functioning very good. For example consider attached image, the "Complete Relations" feature followed by "RerouteLines" feature produces the di...
over 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 3 Future consideration

Approval Trackings - Set a workflow action when working multiple approvals type

In EWM, using Approval Trackings, it's possible to define how an approval state change can trigger a workflow action. That works fine when we have only one approval type but not with multiple approvals. When working with multiple approvals, we hav...
over 2 years ago in IBM Engineering - Workflow Management / Work Items 2 Future consideration

Room Reservation - allow setting of free/busy on iCal attachment that is received by the user

On the room reservation, an email is sent to the user with an iCal attachment. Currently if the iCal attachment is imported into Outlook/O365 by the user their calendar is marked as busy. In the case of reserving a hotel space for a day in the off...
over 2 years ago in IBM TRIRIGA Workplace Experience 2 Future consideration

Rhapsody UI to dynamically scale based on windows resolution

Since Rhapsody 9.01 the appearance of some fonts (like shown on action pins, action body, …) depends on the display scaling: There are two images attached, and from images we can see if we use 125% resolution, then contents in the diagram like act...
over 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 3 Future consideration

Make a Crew Type Inactive so that it can no longer be used

A Crew Type is a template for a Crew. If you do not want the Crew Type to be used again you cannot make it inactive if there are existing crews, but there is nothing which is updated from the crew type to the crew, so why can't you make it inactiv...
over 1 year ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Future consideration

automatic weight and balance calculation with taking into account the aircraft hierarchy and the role status of the AC

The A330 MRTT lives from his flexibility and the different roles how the AC can be operated. Role changes have always impact on the weight and balance and causes additional work in the system. My idea is: it should be possible to link or add the w...
over 1 year ago in IBM MAS - Aviation 0 Future consideration

Provide a facility in DOORS 9 client to give OSLC connections unique/identifiable (in the context of DOORS 9) names.

OSLC connections can be configured for linking in DOORS 9. A configured connection takes its description / name from the remote project it points at. In a scenario where multiple / separate remote systems are home to similarly named projects / con...

ProjectAreas can be split and move across servers

We need to be able to split a ProjectArea and move one part of it to another server / environment, while retaining full functionality with regards to links, reporting, traceability, history. The new server / environment can be an empty system, or ...
about 5 years ago in IBM Engineering - Foundation/Common Services / Unassigned 3 Future consideration