Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 5853

Include formal gates and input/output parameters to sequence diagram references

Hello, according to UML specification (2.5.1) interactions can have formal gates (Figure_17.1_UMLSpecification.png). They would allow messages from and to the diagram frame, see Figure_17.4_UmlSpecification.png and Figure_17.14_UmlSpecification.pn...
9 months ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 1 Future consideration

Issues and Transfers (RBA) - You should be able to change the asset that was selected in the Create Inventory Usage screen for a reservation

On Issues and Transfers (RBA) when you have picked a reservation for a rotating item and you are now in the Create Inventory Usage screen, on save you will receive a message which requires you to select the assets. You do this from the Item Detail...
9 months ago in IBM MAS - Mobile 1 Planned for future release

Add ifdef and ifndef directives to the DXL interpreter to test for active includes and avoid repeated includes of the same files

the include directive is useful for structuring code and expanding scripts during runtime the absence of ifdef / ifndef makes it impossible to test for and avoid repeated includes of the same code (.inc files) this can create unnecessary and consi...
about 1 year ago in IBM Engineering - Requirements Management DOORS/DOORS Web Access / DXL 1 Future consideration

Add try/catch perms to DXL to aid in testing for and catching disruptive layout DXL error messages

In some places, DXL can run and throw errors that disrupt a workflow, block the UI or worse. A try/catch mechanism in DXL could allow DXL authors to test for and catch such situations better.
about 1 year ago in IBM Engineering - Requirements Management DOORS/DOORS Web Access / DXL 1 Future consideration

Outlook add-in accept room immediately to accommodate catering orders

Challenge: Rooms need to be accepted before catering order can be added. The outlook invite needs to be sent first in order to be accepted. It would be great if rooms could be auto-accepted when add prior to send so that catering order can be adde...
about 1 year ago in IBM TRIRIGA Workplace Experience 3 Future consideration

Request RFE with screenshots of desired state

Challenge: Calendar view show ‘Accept’, ‘Pending Approval’, ‘Held’ statuses at the same time and color-coded.
about 1 year ago in IBM TRIRIGA Application Platform 3 Future consideration

Change the green dot for the room on the reservation to red if the room declined the invite.

Challenge: Auto-remove rooms from a meeting if the room declines the meeting
about 1 year ago in IBM TRIRIGA Workplace Experience 3 Future consideration

Expand DOORS database server (doorsd) design to support multithreading

In light of enterprise software deployments moving away from real hardware to virtual machines and cloud environments, it is no longer ideal for DOORS 9 database server to function as a single-threaded process. To benefit from shared resources (st...
about 1 year ago in IBM Engineering - Requirements Management DOORS/DOORS Web Access / Performance 1 Future consideration

Ability to deny read permissions on streams

Ability to deny read permissions on streams.Use Case: We use substreams containing customer specific information. These need to be submitted to IPP (Intellectual Property Protection). This is currently not possible because we cannot define view pe...
about 1 year ago in IBM Engineering - Requirements Management DOORS Next / Administration 0 Future consideration

Add SKDPROJECT.SITEID and display on Graphical Work Week, Graphical Scheduling, Graphical Assignment and Graphical Resource View list to allow filtering by site to narrow down the appropriate records in SKDPROJECT for use.

For generation utilities scheduling, assignment, etc. is usually done by site. Currently there is no way to separate out Schedules, Work Lists or Resource Lists other than including a Site identifier as part of the SKDPROJECT.NAME and/or the SKDPR...
over 2 years ago in IBM MAS - Scheduler 2 Future consideration