Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 2816

Populating Target Start Date for Meter Based PM Work Orders

The Target Start and Finish dates on a Work Order does not incorporate lead time on work order creation from a meter based PM.
over 9 years ago in IBM MAS - Manage (Base) 3 Future consideration

Create and utilize Failure-Codes Analysis Report Functionality to WO Module and related Applications

The failure codes functionality is a powerful feature of Maximo that enables standardization of failure reporting to Work activities.Although the failure reporting is made easy throughout WO apps (e.g. WOTRACK, Quick Rep.), there is no actual repo...
over 3 years ago in IBM MAS - Manage (Base) 0 Future consideration

ETM documentation should specify that an option exists to edit existing Test Case Results (TCR)

Ref : https://www.ibm.com/docs/en/engineering-lifecycle-management-suite/lifecycle-management/7.0.2?topic=tests-running-test-cases Steps 1 - 11 are valid for Run Test Case workflow. Step 12 suggests an "Update.." to Test Case Result is possible.Th...
about 1 year ago in IBM Engineering - Test Management / Documentation 0 Future consideration

Remember my change position when screen is refreshed in non-applet workflow

We use Maximo 7.6.1. When we modify a non-applet workflow, the screen is refreshed. I can't locate my change easily.
over 2 years ago in IBM MAS - Manage (Base) 3 Future consideration

LQE reporting should restrict work item visibility based on EWM Access groups

This is a compliance issue. We use Access Groups to restrict visibility of sensitive data in EWM, but when reporting in Report Builder using LQE, all work items in a project or team are visible.
over 2 years ago in IBM Engineering - Reporting / Lifecycle Query Engine 2 Future consideration

keep focus on selected artifact in module view when switching between configurations or creating change sets

Currently, the focus inside the module view is loost when a change set is created or discarded and the top of the module is displayed. This causes users to search again for the selected artifact they have been working on, leading to inefficiency a...
over 2 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 1 Future consideration

On Maximo Mobile application, the supervisor is not able to see downtime entries previously added to the Work Order

Allows user to validate and manage downtime using mobile app.
over 2 years ago in IBM MAS - Mobile 1 Future consideration

Fix the External link Navigation functionality so it does not display an ugly message on the original tab after it has opened the external url on a new tab

See IBM Case #TS013850718 for details. When adding new menu items to one of the navigation items.In the "Navigation Item Editor" We are selecting "External Url" in the Target DetailsThe Url we select is local to our company (does not matter though...
about 1 year ago in IBM TRIRIGA Application Platform 1 Future consideration

Prevent change the status of review when it is paused

The procedure is below: 1. Create review 2. Add Participants and Add Artifacts 3. Start Review, and then pause Review At this step, a user who creates review can change status. It means this user can set participants status to be 'Approved/Review...
over 2 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Ability to see all records in the Location Hierarchy

Giving flexibility to see all location records in the location hierarchy without impacting performance, perhaps the ability to have pages instead of a list all that goes only to the first 1,000 records for example
about 6 years ago in IBM TRIRIGA Application Platform 36 Future consideration