Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 5690

provide in DNG a true CSV export option (not adding any special characters during the export)

Since you added a =" to all CSV Exports where numbers with delimiter are uses, e.g. for the "link by attribute" attribute 12345.12345 is output as ="12345.12345". You added this in "CSV Module Roundtrip with Excel can potentially corrupt textual d...
about 1 year ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Ability for techs to view inventory bins and balances when adding materials

Sometimes a tech needs to find new parts or materials for a job. They need to be able to quickly search for them across multiple stores and know there is stock before they travel to get them.
about 2 years ago in IBM MAS - Mobile 0 Future consideration

Maximo Mobile (Android OS) and ability to use MDM to manage screen share capability

Maximo Mobile on Android allows the user to change a privacy setting to allow the ability for screen share/capture. This idea to to allow this setting to be accessible by Mobile Device Management software so that it can be centrally managed by IT ...
over 1 year ago in IBM MAS - Mobile 1 Future consideration

single web-logout URI across ELM applications

There is currently a Web Logout URI advanced property in each ELM application's administration page. That property does not exist for JRS (meaning there is no single-sign out for LQE, LDX or RB), which is either a defect or a different enhancement...
6 months ago in IBM Engineering - Reporting 2 Future consideration

Copy of a query should also copy 'Team and Project Area Sharing'

In EWM, I would like the team area to be copied as well when I select Save copy. I use an existing query to create other queries for my team. These are all used by the same team. Currently, I use save copy, then have to remember to go to the detai...
6 months ago in IBM Engineering - Workflow Management / Work Items 1 Future consideration

Associate a workflow with a workflow

I want to give access to users to Edit State attribute (wokflow inside module) only if The module state (workflow related to the module) is in working state.
6 months ago in IBM Engineering - Requirements Management DOORS Next / Administration 0 Future consideration

Records Cost Audit by Updated_On date.

Can a new report be created, or the existing report enhanced, to allow for the Records Cost Audit to be based on "Updated_On" date? The current report is based on the record's "End_Date". As an example, if a record is entered today with the incorr...
about 1 year ago in IBM Envizi - ESG Suite / Base Platform 1 Functionality already exists

Defect id should be a mandatory input for failed test case in RQM

Currently there is no request to provide the defect id/problem work item id to one test case in RQM that ends with Failed result. It should be implemented as one improvement for failed test case. Defect id or problem WI need to become a mandatory ...
over 1 year ago in IBM Engineering - Test Management / Documentation 0 Future consideration

No restriction of characters on filtering on string attributes of custom attributes in DOORS Next

Current situation: When using a full text filter or a string attribute filter in modules, then the filter will only take into account the first 512 characters of the string attribute. This behaviour is only true for custom attributes, not for the ...
about 3 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 5 Future consideration

Delete a link to a changeset into a Work Item when deleting a repository workspace

The user is doing this:1) create a change set and associate a work item with it2) delete the entire workspace from the repository (in which the changeset has been created) Today (in ELM 7.0.2): the link in the associated work item is still in plac...
over 1 year ago in IBM Engineering - Workflow Management / Work Items 1 Not under consideration