Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

IBM Engineering - Requirements Management DOORS Next

Showing 467

Option to set or change the RDF URIs in type definition

While adding the enumerated values, DNG allows adding multiple values. But only Label/Value can be added. RDF URI (needed for traceability across different components and project areas) must be assigned individually and uniquely for all data types...
5 months ago in IBM Engineering - Requirements Management DOORS Next / Administration 0 Future consideration

End User cannot move artifact to another folder without having DELETE permission

End Users should never have the ability to delete an artifact, but the delete permission must be assigned in order to allow end-user to move artifacts between folders. As a result, Jazz admins with super-admin permissions are being called upon to ...
over 2 years ago in IBM Engineering - Requirements Management DOORS Next / Administration 4 Future consideration

DNX Feature Request: Bulk removal of links for a set of artifacts

In DNX it's possible to add links to several artifacts at once. But it's not possible to remove or replace links from several artefacts at once. A feature is requested that allows to remove or modify links for several artefacts at once.
11 months ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Enable Linking across Cross Server Projects/Components with Link Constraints to improve Traceability whilst increasing Linking Accuracy

Scenario : GC : [Component A_C1 Initial Stream , Component Z_C1 Initial Stream] Server 1, Project A, Component A_C1 Artifact Type : SubSystem Requirement Specification, SubSystem Requirement Link Constraints [SubSystem Requirement Satisfies System...
11 months ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Artifact Audit History should show all users that made modifications, in addition to the users that submit changesets

Currently, each item in an artifact's audit history shows: - the change that was made - the user that made the modification - the time of the modification - a link to the changeset the change was made in The exception to this rule is that the last...
11 months ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Prevent URI misalignment for same artifacts across different projects and components, across DNG Servers

We are in the process of migrating from v6.0.6.1 to v7.0.2. As part of the migration process, we have performed data cleanup to align the DNG Type System. However, standard usage of the system may cause us to drift overtime and issues will be intr...
almost 2 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

DNG : Right Sidebar customize display preference

When you open a module, in DNG, sometimes the right sidebar is displayed or not. In the user preferences, is it possible to have a "sidebar display option" to define if the right sidebar is automatically displayed or not : if the user option is no...
over 2 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Review Comment Filtering Improvements

The current requirement review interface is not great for responding to reviews. The following would be appreciated: 1) Add the ability to collapse different sections (for example, when responding to comments, it is not necessary to see a list of ...
almost 2 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 1 Future consideration

DNG change sets shall be also available in JRS for reporting

As a user I also want to report not only in a stream or baseline, I also need to report in a change set.
almost 3 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Progress of report generation gives % indication of progress to user

This is related to defect https://jazz.net/jazz03/web/projects/Requirements%20Management#action=com.ibm.team.workitem.viewWorkItem&id=126799 When generating a report in DNG the "Percent Completion" only shows 0% complete and then it just compl...
almost 3 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration