Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 2743

Cognos 11 BI Packs

Create a package of standard industry best practice Cognos 11 Dashboards, Visualizations, and Reports for Maximo. We realize these may need to be customized to meet each company's ways of working, but having a package that can be implemented out o...
about 2 years ago in IBM MAS - Manage (Base) / Reporting 0 Future consideration

Report Builder should support tables

Rich text editors in Engineering Test Management allow creating tables in sections like test case results. Those tables are lost in report builder and subsequently in output from Report Builder, e.g. Word/PDF/HTML. Report Builder should support ta...
about 2 years ago in IBM Engineering - Reporting / Report Builder 3 Future consideration

Reviews should show Review Status and time stamp per artifact and Approver

The Reviews and the Reports should show the Review Status for each artifact with a time stamp so that we can tell when an artifact was approved or disapproved and by which Approver. This becomes problematic when there isn't a unanimous decision ma...
about 2 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Feature to hide Stereotypes of model elements in Diagrams

A) allow to "hide" the stereotype applied to a model element as "new term" - (this would include <> but also custom stereotypes you might create) B) allow to select which stereotypes to display explicitly via the Display options (maybe the s...
over 4 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 1 Future consideration

SAP adaptor code assumes bother maximo and SAP resides in same timezone

SAP adaptor code assumes both Maximo and SAP resides in the same time zone and all the dates in different adapter codes are converted into database time instead of the timezone where the other system is located. For more details case TS003609405 c...
over 4 years ago in IBM MAS - Manage (Base) 0 Future consideration

Scheduler- Days of the week in gantt view not showing, only dates and weeks

When using the time line in graphical scheduler and graphical assignment manager there is only an option to have weeks number, date or a time. What the users have asked for is the ability to show the days. So for example M T W T F S S above the date.
over 6 years ago in IBM MAS - Scheduler 1 Future consideration

Planned Start Date & Planned End Date should get displayed for Iterations.

QM - Don't see option to display Planned Start/End Dates for Iterations. I have created multiple Iterations for different Phases with different dates under Project Timeline. But unable to display actual Planned Start Date and Planned End Date al...
about 2 years ago in IBM Engineering - Test Management / Usability 0 Future consideration

Function Hierachy in Browser

Dear all, I hope you could help me. I’m searching a way using context patterns for the “Browse Part” functionality Functional Hierarchy. The linkage is: SF_1_1_1 to SF_1_1 to SF_1. Constraint: I do not want to make the dependency direction SF1 to...
about 2 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 1 Future consideration

New Diff Merge Build

The current version of Diff Merge required Microsoft Visual Studios 2005 libraries in order to properly function, specifically in regards to the "Merge Text" option within the tool. However, 2005 is beginning to not be supported anymore by some mo...
about 2 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Integrations and APIs 1 Future consideration

Formal Review triggers Requirement Workflow transition

ETM has a capability to trigger the Test Artifact Workflow (to transition to Approved/Draft/etc) based on the result of formal reviews. A similar functionality should be available in RM, where if a base artifact is added to a review, they automati...
about 2 years ago in IBM Engineering - Requirements Management DOORS/DOORS Web Access / Tools 0 Future consideration