Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 2805

Manage multiple qualifications

Management of resources with multiple qualifications (e.g.: mechanics able to work on A320 and A350, mechanics allowed to work on AF and AV tasks) and allow the optimiser to choose the allocation.
about 2 years ago in IBM MAS - Scheduler 0 Future consideration

Critical Path calculation (dependencies + resources)

The aim of the critical path (CP) is to obtain a list of constraints (precedence, date, operation attributes...) that are critical and/or limiting in the proposed solution to evaluate the risk of having delays on them or to define which ones can b...
about 2 years ago in IBM MAS - Scheduler 0 Future consideration

Date autofill when state changes in Test case

In the Test case, there will be one custom date type field. so whenever the state gets changed to "Ready for Review, " the system date should be auto-updated in that custom field. Is there any possible way to do it?
about 2 years ago in IBM Engineering - Test Management / Integrations 0 Future consideration

Enable Rhapsody Design Manager Client extension to allow Kerberos/SPNEGO SSO authentication on DM server with fallback to bas

Rational Rhapsody Design Manager is a commonly used product that provides environment Software design, development, reporting, and testing for better control of the software development life cycle. Description: Our team is in process of using Rhap...
over 8 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Rhapsody Client 2 Future consideration

Request "Split Work" functionality currently in GS to be added to GA

Currently Graphical Scheduler has the ability to Split Work. This same functionality should be extended to Graphical Assignment in the Work view tab.
about 4 years ago in IBM MAS - Scheduler 2 Future consideration

Control Panel: add Transparency to Diagram Tools and Common and Free Shapes

Add a Transparency Level to each Diagram Tool and Common and Free Shape on the Control Panel. This feature will allow a background picture (e.g., JPEG) to be placed on a control panel, and then have Diagram Tools and Common and Free Shapes placed ...
about 4 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 1 Future consideration

Provide a new predecessor-successor constraint type.

Introduce a new parameter regarding the feasibility of the dependency decleared for an operation and its predecessor. It will be marked as a YES/NOT choice. When, the dependency is "Feasible", it is mandatory to be respected (it will be treated as...
about 2 years ago in IBM MAS - Scheduler 0 Future consideration

Create dependecy type to avoid tasks to be scheduled in parallel

Add a new constraint that avoids two task to be scheduled simultaneously. Tasks might be scheduled before or after but never in parallel. The constraint will be addressed as "NOTINPARALLEL".
about 2 years ago in IBM MAS - Scheduler 0 Future consideration

Zone exclusion

Exclude operations to be scheduled in a zone based on the work scheduled
about 2 years ago in IBM MAS - Scheduler 0 Future consideration

Declaration of max duration of parent work order to improve declaration of the work order inside HSOC

Add a new kind of constraint on envelop work order to limit its duration (and the duration of its children). Needed to act on the following modules: - Add a new field in the work order view to manage the max duration Optimization - Add parameters ...
about 2 years ago in IBM MAS - Scheduler 0 Future consideration