Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

IBM Engineering - Workflow Management

Showing 530

Option to select subscribers when duplicating or copying the workitem in ccm

Every time when users create a copy of a workitem in CCM , it is required to add Subscribers one by one. Need option to select the subscribers in the check list and copy the subscribers available in source workitem.
almost 5 years ago in IBM Engineering - Workflow Management / Work Items 0 Future consideration

Work item history shows previous hostname before renaming in work item URL which was updated in discussion after server rename.

Work item history shows previous hostname before renaming in work item URL which was updated in discussion after server rename. Environment IBM Engineering Workflow Management 7.0.2 SR1 Step to reproduce1. Set up JTS/CCM with "https://jazz.ibm.com...
12 months ago in IBM Engineering - Workflow Management / Work Items 1 Future consideration

Multiple file transfers with the Web Client

As a Linux Developer, I would like to be able to perform multiple file transfers with the Web Client as Web UI is the only client on Linux that does accept Smart Card Authentication
almost 6 years ago in IBM Engineering - Workflow Management / Source Control 3 Not under consideration

Allow changing the default list of columns displayed in new queries

When you create a new query it displays the below column list by default.   Type  Id  Summary  Owned By  Status  Priority  Severity  Modified Date This list needs to be edited for every new query, however. Customers are asking for how to control t...
almost 6 years ago in IBM Engineering - Workflow Management / Usability 2 Not under consideration

Respect line breaks in String and HTML attributes when displaying results of EWM work item query in web client

In EWM 7.0.1, line breaks do not display in the results returned when running a work item query. Resulting in unformatted text that is difficult to read. If you have a String or HTML attribute on an EWM work item, the value is concatenated into a ...
almost 2 years ago in IBM Engineering - Workflow Management / Work Items 1 Future consideration

Incomplete mapping cannot be completed without incorrectly importing data

When importing a set of work items from a PA with another base template out of a csv-file, in the source, there may be a field that do not exist in target.There is no problem, if a similar field with a different name exists in the target.But there...
12 months ago in IBM Engineering - Workflow Management / Work Items 1 Not under consideration

Support a configurable work item editor presentation for Quick Planner so it can be aligned with other work item editor presentations.

Currently the Quick Planner presents an editable list of work item attributes, but the view of which attributes are listed is not configurable in the process configuration, this editor appears to be hard coded and it results in anomalies where som...
12 months ago in IBM Engineering - Workflow Management / Planning 1 Future consideration

Paging the huge set of links as it affect the work items performance

The work items with huge set of links should be paged when there are more then X Links (for example X=10) as it takes more than 30 sec. to load
about 6 years ago in IBM Engineering - Workflow Management / Work Items 3 Not under consideration

JazzIgnore symbolic links

I would like to be able to ignore symbolic links in the files managed in configuration management.As they don't have any extension, it is not possible to ignore them with an extension. Enhancement 392359 closed--> RFE
about 5 years ago in IBM Engineering - Workflow Management / Source Control 2 Not under consideration

EWM Eclipse - Add option for opening the location of a file in file explorer

The behavior of what "Open Local File" opens, how and if it can be saved is not predictable for a user and he will always assume it opens in a way it can be saved as well, but sometimes it is not saved correctly. Several colleagues already have lo...
about 1 year ago in IBM Engineering - Workflow Management / Usability 5 Not under consideration