Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 5785 of 5785

Make a Crew Type Inactive so that it can no longer be used

A Crew Type is a template for a Crew. If you do not want the Crew Type to be used again you cannot make it inactive if there are existing crews, but there is nothing which is updated from the crew type to the crew, so why can't you make it inactiv...
over 1 year ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Future consideration

automatic weight and balance calculation with taking into account the aircraft hierarchy and the role status of the AC

The A330 MRTT lives from his flexibility and the different roles how the AC can be operated. Role changes have always impact on the weight and balance and causes additional work in the system. My idea is: it should be possible to link or add the w...
over 1 year ago in IBM MAS - Aviation 0 Future consideration

Room Reservation - allow setting of free/busy on iCal attachment that is received by the user

On the room reservation, an email is sent to the user with an iCal attachment. Currently if the iCal attachment is imported into Outlook/O365 by the user their calendar is marked as busy. In the case of reserving a hotel space for a day in the off...
over 2 years ago in IBM TRIRIGA Workplace Experience 2 Future consideration

Caption & Maximize Tool bar is NOT present on embedded images as they are on embedded Tables

In a DNG Module, a single artifact 'embeds' either a table or an image. The Table has features to edit Table Properties (with right mouse click). The Table Properties provide a way to Caption the table and to Maximize or Minimize the artifact with...
about 5 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 2 Not under consideration

Rhapsody UI to dynamically scale based on windows resolution

Since Rhapsody 9.01 the appearance of some fonts (like shown on action pins, action body, …) depends on the display scaling: There are two images attached, and from images we can see if we use 125% resolution, then contents in the diagram like act...
over 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 3 Future consideration

DNG issue with drag and drop for links

It seems that DNG logic doesn't allow for a drag and drop of a requirements from one component to another unless there is a change set in the side receiving the drop (even if the link will be stored in the starting (drag) side and has a change set...
about 5 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 1 Not under consideration

Repair Tools Integrated in Application

All the various data repair tools that are available for DNG shall be integrated into the product, and delivered at GA time. This includes, but is not restricted to, the DNGRT tool, FolderIntegrityCheck, L3ToolEncryptPassword, LinkScanner, LinkSwa...
about 5 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 1 Not under consideration

ProjectAreas can be split and move across servers

We need to be able to split a ProjectArea and move one part of it to another server / environment, while retaining full functionality with regards to links, reporting, traceability, history. The new server / environment can be an empty system, or ...
about 5 years ago in IBM Engineering - Foundation/Common Services / Unassigned 3 Future consideration

Terminate user session(s) upon account inactivation.

Configure the application to terminate existing sessions of users whose accounts are inactivated. This is a NIST (RMF) mandated requirement for all US Government information systems."Applications must provide a user management feature or function ...
almost 7 years ago in IBM MAS - Common Services 0 Future consideration

Asset Record Duplication

In Asset Application, Pick any status of asset record and duplicate it. After duplicating the asset record the same status displayed. It should populate as "Not Ready" status. For example: if Operating status record duplicated then the same status...
over 7 years ago in IBM MAS - Manage (Base) 0 Future consideration