Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 5963 of 5963

Enhancements to the PM Module - PM.COUNTER

PM.Counter: This attribute has multiple uses which is in correct. It should server one dedicated purpose i.e. reflect a single entity. These are the multiple things that the counter is trying to denote. As Per http://www-01.ibm.com/support/knowled...
almost 9 years ago in IBM MAS - Manage (Base) 2 Future consideration

Extra Text in Report

When we are downloading Condition Report from List tab, the details field is having <!-- RICH TEXT --> in the end.
almost 2 years ago in IBM MAS - Manage (Base) / System Admin Config/Security 0 Future consideration

Room Reservation - allow setting of free/busy on iCal attachment that is received by the user

On the room reservation, an email is sent to the user with an iCal attachment. Currently if the iCal attachment is imported into Outlook/O365 by the user their calendar is marked as busy. In the case of reserving a hotel space for a day in the off...
over 2 years ago in IBM TRIRIGA Workplace Experience 2 Future consideration

Hide Manage this Project Area and Manage Component Properties for end-users without Jazz Admin privileges

TS005165375 and TS012539586 and Idea ENGCS-I-65 When end-users can enter Manage This Project Area and run Permissions to display they create a very expensive scenario. If any number of users do this it causes performance issues with the DNG applic...
almost 2 years ago in IBM Engineering - Requirements Management DOORS Next / Administration 0 Future consideration

For REST API, include all state transitions in stateTransitions information, but omit stateTransitions from itemHistory

In 7.x.x the information in stateTransitions was reduced from one element per state transition to only the first transition per state, this considerably reduces the use of stateTransitions for effective workflow analysis and results in the need to...
almost 2 years ago in IBM Engineering - Workflow Management / Work Items 1 Not under consideration

Compare Configuration for Reviews

The current compare configuration tool generates differences for the entire component, which often causes the tool to run very slowly and discourages its use by end-user. It would be useful if there was an option within a review to generate a comp...
over 3 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Not under consideration

Ability to Pause DNG Rebase to withstand a server restart.

A Full Rebase of DNG resources can take 5 to 7 days preventing any other type of maintenance which would include a server restart. It would be nice to have this similar to the way LQE indexing can be paused.
over 3 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Not under consideration

Inspection form creates 2 forms per Work Order

I have this screen of 26 inspections, this is just me testing and on those 26, 13 are absolutely useless to the end user as they are a double occurrence of another. Now here is what happen in the real life of a train maintenance site; for Eglinton...
over 4 years ago in IBM MAS - Manage (Base) 5 Is a defect

Spilit "Require Workspaces to Be Caught Up Before Delivery" preconditon

Stream and workspace two distinct concepts/objects in RTC. Streams are long lived and where as workspaces are short lived used by each developer for personal work which is delivered to team stream. The existing precondition "Require Workspaces to ...
over 3 years ago in IBM Engineering - Workflow Management / Source Control 2 Future consideration

Block / Postpone the Scheduled User Reports During Meta Model Refresh

Use Case : For Enterprise ELM Instances, Meta Model Refresh runs ~4h. This leads to Meta Model Refresh failures and User Reports will have inconsistency because there were scheduled JRS Reports running at the same time as Meta Model Refresh Soluti...
11 months ago in IBM Engineering - Reporting / JRS 1 Future consideration