Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

IBM Engineering - Requirements Management DOORS Next

Showing 925

RDNG - Possibility of creating link in process diagram

In a process diagram, it is not possible to include links directly to the object in a diagram, they are restricted run by the Links side menu. The user asks if it is possible to enable the use of links directly on diagrams and flows, as it worked ...
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Cloning with GC conflict errors regarding conflicts is not helpful

When trying to clone a module between components and the GC is involved at the end of the cloning process if a conflict is found (due to overlapping artifacts) the error message is not informative; also when it provide some information about GC it...
almost 1 year ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Need a tool or feature to fix type system inconsistencies

LQE RB Reports don't resolve when RDF URI Conflicts exist within ELM Properties. During Report Creation Time, conflicts appear on the screen for report builders. These conflicts should never be allowed to coexist in the same ELM instance. No provi...
6 months ago in IBM Engineering - Requirements Management DOORS Next / Administration 1 Future consideration

provide in DNG a true CSV export option (not adding any special characters during the export)

Since you added a =" to all CSV Exports where numbers with delimiter are uses, e.g. for the "link by attribute" attribute 12345.12345 is output as ="12345.12345". You added this in "CSV Module Roundtrip with Excel can potentially corrupt textual d...
about 1 year ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Saving of the Link Validity property in a Component Template (.archive)

During saving a Component Template (.archive), the Link Validity property is not saved, which is not the expected behaviour. Impact :In each component created from this template (.archive), it is necessary to go to "Manage Component Properties -&g...
about 6 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 4 Not under consideration

DOORS Next:Scheduled validation execution function

The reporting function is very useful in the use of DOORS Next, but reports using LQE frequently exhibit strange behavior. To resolve this situation, it is recommended to perform validation, but only manual execution is supported. Automatic execut...
about 2 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

In a module, have possibility to insert an existing from an another component

In Doors NG, in a module, it could be useful to have possibility to insert an existing from an another component. Workaround :In the component (and not in the module), Copy from a component the desired artifact and then in the module, click on Ins...
about 6 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 5 Not under consideration

in-app reviews require opening 5 to 10 tabs to complete

How to get just what you changed for review and shows links for that. Prefer to do inside the tool, but difficult.Not being able to conduct reviews in the tool and the difficulty of exporting a change set to a document to facilitate review outside...
6 months ago in IBM Engineering - Requirements Management DOORS Next / Usability 2 Not under consideration

No multi-component-set view

The inadequacy of the change set views and exports when it comes to links to/from other components. i.e. not having a “multi-component-change-set” sort of view.
6 months ago in IBM Engineering - Requirements Management DOORS Next / Usability 2 Not under consideration

Create Report Doesn't have all the information required to do the review

On Compare ConfigurationsMissing text/attributes. Not enough context to review the changes. Will also fail on modules with broken links.
6 months ago in IBM Engineering - Requirements Management DOORS Next / Usability 2 Not under consideration