Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 5910

RTF export from descriptions of Rhapsody model elements

I'm searchin a way to export the description of a use case from Rhapsody to Word using the PUB. A constraint what I have is not to use Word-Macros as these can contain viruses and are not allowed in our company. Therefore I need a solution to publ...
11 months ago in IBM Engineering - Lifecycle Optimization Publishing / Document Studio 4 Not under consideration

Fuel Transactions import(Tr) application is only used on loading the Asset meters. Need support to load the Location Meters also. Specially it should work like how we are doing manually in Locations applicaton. It has to copy the meter readings to the assets in that location.

It's useful and it will reduce manual work for the operators. Because its difficult to collect each and every asset's meter reading. Instead just updating the location meter , should update multiple assets under it.
11 months ago in IBM MAS - Transportation 1 Not under consideration

MAXIMO Mobile 8.7 Redesign Meter reads interface - allow editing of only 1 meter at a time

Allow editing of only 1 meter at a time from list instead of all at the same time. In case of multiple large number of meters per asset it may be necessary to switch back and forth between meter list and meter data entry, which will require user t...
almost 3 years ago in IBM MAS - Mobile 2 Planned for future release

Drag and drop from Microsoft Outlook to CLM

Drag and drop from Outlook does not work. You always have to save the mail (or doc) first. Can this be improved?
over 5 years ago in IBM Engineering - Workflow Management / Work Items 3 Not under consideration

Allow Kanban WIP to be more defined to individual

Kanban template in RTC normal planning allows for WIP for columns "by group" which is great for large groups and complex design. However, for smaller groups, we would like to group by owner, and then use WIP to limit the amount of work by that owner.
over 5 years ago in IBM Engineering - Workflow Management / Planning 2 Not under consideration

Support OSLC queries in Architecture Manager (AM) application

Support OSLC queries in Architecture Manager (AM) application
over 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Other 1 Future consideration

Allow direct print features in toolbars of single page applications

I am unable to have reports show up in the toolbar in a custom single-page application. I have tried configuring the report as shown in the Browser View section of the how-to document here (https://www.ibm.com/support/pages/report-toolbar-access-s...
over 3 years ago in IBM MAS - Manage (Base) 0 Not under consideration

Selling Historical Forecasts

We currently do not have the means to send historical forecasts to customers at scale. We also do not have the ability to sell historical forecasts. We recently lost a deal with historical forecasts being the primary reason. Below you will find fe...
almost 3 years ago in Environmental Intelligence Suite: Add-ons / General 1 Future consideration

Issues and Transfers (RBA) - The Quantity to Issue should default to the unissued reserved quantity rather than one

When using Issue Reserved Items, picking the item and using the Select button in the Create Inventory Usage screen the Quantity to Issue currently always defaults to one and not the unissued Reserved Quantity. It would be better to default to the ...
11 months ago in IBM MAS - Mobile 1

To allow from RPE the identification of the direction of the Synonym link used in RM

Hi, We are using the default Synonym link type in RM application to link artifacts allocated in different project areas. For this default link, the ingoing and the outgoing links have the same name: "Synonym". In addition, we use this link type fo...
almost 3 years ago in IBM Engineering - Requirements Management DOORS Next / Documentation 3 Future consideration